MidBishop (CAISO-2362) — Project Summary

Queue ID
CAISO-2362
Capacity
381.981269 MW
Technology
Solar+Battery
Status
active
Location
Kings, CA
Region
CAISO
Developer
—
IA Status
Not Started

MidBishop

CAISO-2362BetaActiveSolarBatteryCAISOLBNL

381.981 MW hybrid in Kings, CA · In queue since April 2023 · Proposed COD March 2029

BA: CISOISO/RTO: CAISONERC: WECCRC: RCW

381.981 MW

Capacity

2

Components

Solar + Battery

3y 7m

In Queue

Not Started

IA Phase

COD target: 2029

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

5y 11m

Study Phase

Cluster 15

In Study38%
Queue EntryApr 17, 2023

Interconnection request submitted to ISO/RTO

Cluster Study (Phase I/II)Current

CAISO uses cluster studies where projects are batched annually and studied together.

Typical: 36–48 months (IR to IA)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2029-03-30

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Mar 30, 2029
From queue filing
Developer in saved assessment
—
Status at research time
Active
Active in CAISO queue (PG&E area, Dry Lake SW Sta 500 kV POI); IA not started, no public construction or financing signals found.
Financing
Not recorded
Research sources and reasoning (4 recorded sources)

low confidence at research time

  1. interxdata.com/projects/midbishop-caiso-2362/
  2. cleanview.co/power-projects/planned/battery-storage-projects/california/54704_storage/midbishop
  3. cleanview.co/power-projects/planned/solar-farms/california/54704_photovoltaic/midbishop
  4. interconnection.fyi/project/caiso-54704

Commercial operation date: Only LBNL-derived data supports the date. Cleanview lists 'expected to come online in March 2029' and 'Expected online 2029', but these are aggregator copies of the queue data rather than independent developer-backed signals.

Developer: LBNL developer field is null and none of the search results name a developer or operating company; they are queue aggregators only.

Status: LBNL, interconnection.fyi and interXdata all list the project as active. A separate 'MidBishop Energy Storage' (caiso_c15_204, withdrawn, 1,191 MW) is a different queue entry and does not change this project's status.

About

Saved background

Generated Oct 25, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

MidBishop is a proposed hybrid solar and battery storage development project located in Kings County, California. The project has a total capacity of 381.98 MW, consisting of a 307.78 MW solar photovoltaic component paired with a 74.2 MW battery energy storage component. The project is situated within the service territory of Pacific Gas and Electric Company (PG&E) and is planned to interconnect at the Dry Lake Switching Station 500 kV point of interconnection. No developer has been publicly identified in the available queue data.

The project is listed as active in the California Independent System Operator (CAISO) interconnection queue under queue ID CAISO-2362, with a queue entry date of April 17, 2023. It is being evaluated as part of CAISO's Cluster 15 study process and has requested Network Resource Interconnection Service (NRIS). As of the latest data, an interconnection agreement has not yet been started. The project has a proposed commercial operation date of March 30, 2029.

Summary provenance

Summary generated Oct 25, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • LBNL queue source as of: Dec 31, 2025.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

CA

County

Kings

Grid Region

CAISO (California)

Market

ISO/RTO Member

Developer

—

Utility

PGAE

Entity

CAISO

Service Type

NRIS

Point of Interconnection

DRY LAKE SW STA 500 kV

Data Source

LBNL

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Technology
Solar307.779 MW · 81%
Battery74.202 MW · 19%
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
CAISO
Trading Hub
TH_ZP26_GEN-APND
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.