Maravillosa 1
406.64 MW hybrid in Kings, CA · In queue since April 2023 · Proposed COD June 2029
406.64 MW
Capacity
2
Components
Solar + Battery
3y 7m
In Queue
Not Started
IA Phase
COD target: 2029
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
6y 2m
Study Phase
Cluster 15
Interconnection request submitted to ISO/RTO
CAISO uses cluster studies where projects are batched annually and studied together.
Typical: 36–48 months (IR to IA)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2029-06-30
Cross-source intelligence
Experimental assessment saved at the research date. See the queue record for reported project facts.
Research sources and reasoning (4 recorded sources)
low confidence at research time
- cleanview.co/power-projects/planned/battery-storage-projects/california/54624_storage/maravillosa-1
- interconnection.fyi/project/caiso-54624
- interxdata.com/projects/maravillosa-1-caiso-2360/
- interconnection.fyi/projects/state/CA/kings-county
Commercial operation date: LBNL lists a proposed COD of 2029-06-30. Cleanview shows the same June 2029 date, but it appears to be derived from the queue data, so it is not an independent post-LBNL signal. No developer press release or news gives a different target.
Developer: LBNL developer field is null and none of the search results (aggregator listings and unrelated pages) name a developer or parent company.
Status: LBNL status is active, and interconnection.fyi and interxdata aggregators also list the project as active. No signals of withdrawal or construction were found.
About
Generated Oct 25, 2026
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
Maravillosa 1 (queue ID CAISO-2360) is a proposed solar-plus-battery hybrid development project in Kings County, California, with a total capacity of 406.64 MW. It pairs 204.02 MW of solar generation with 202.62 MW of battery storage. The project would interconnect at the Dry Lake Switching Station 500 kV point of interconnection, in the service territory of Pacific Gas and Electric Company (PG&E). No developer is identified in the available queue data.
The project entered the California Independent System Operator (CAISO) interconnection queue on April 17, 2023, and is being evaluated as part of Cluster 15. It has requested Network Resource Interconnection Service (NRIS), and its queue status is active. Its proposed commercial operation date is June 30, 2029. The interconnection agreement process has not yet started.
Summary provenance
Summary generated Oct 25, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- LBNL queue source as of: Dec 31, 2025.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
CA
County
Kings
Grid Region
CAISO (California)
Market
ISO/RTO Member
Developer
—
Utility
PGAE
Entity
CAISO
Service Type
NRIS
Point of Interconnection
DRY LAKE SW STA 500 kV
Data Source
LBNL
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- CAISO
- Trading Hub
- TH_ZP26_GEN-APND
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Solar queue pipeline by status
Data tables and metrics from the InfraSure database.
AEP Jacksonville Solar Project
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
can you provide me with the capacity factor for allrenewable facilities in 2024
Data tables and metrics from the InfraSure database.
Top 10 solar states
Data tables and metrics from the InfraSure database.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.