Brundage Energy Storage
202.267 MW storage in Los Angeles, CA · In queue since April 2023 · Proposed COD June 2029
202.267 MW
Capacity
1
Components
Battery
3y 7m
In Queue
Not Started
IA Phase
COD target: 2029
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
6y 2m
Study Phase
Cluster 15
Interconnection request submitted to ISO/RTO
CAISO uses cluster studies where projects are batched annually and studied together.
Typical: 36–48 months (IR to IA)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2029-06-01
Cross-source intelligence
Experimental assessment saved at the research date. See the queue record for reported project facts.
Milestones in this assessment
Cluster 15 interconnection request filed, IA not yet started per LBNL
caiso.comResearch sources and reasoning (3 recorded sources)
low confidence at research time
- caiso.com/documents/cluster-15-interconnection-requests.xlsx
- cleanview.co/power-projects/planned/battery-storage-projects/california/54697_storage/brundage-energy-storage
- cpuc.ca.gov/-/media/cpuc-website/divisions/energy-division/documents/integrated-resource-plan-and-long-term-procurement-plan-irp-ltpp/2024-2026-irp-cycle-events-and-materials/assumptions-for-the-2025-2026-tpp/mappingcifrom_cluster15_apps_09-25-24.xlsx
Commercial operation date: Only LBNL queue data provides a COD target of June 2029. No news sources or press releases confirm or update this date. Cleanview aggregator mirrors the LBNL date without independent verification.
Developer: LBNL queue snapshot lists developer as null. No press releases, news articles, or corporate announcements identify the project sponsor. CAISO Cluster 15 spreadsheet and aggregator sites do not name a developer.
Status: LBNL reports 'active' status with IA 'Not Started'. CAISO Cluster 15 documentation confirms the project is in the study queue at 202.27 MW connecting to SCE's Antelope 230kV substation. No withdrawal or suspension signals found.
About
Generated Oct 25, 2026
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
Brundage Energy Storage is a proposed battery energy storage development project located in Los Angeles County, California. The project has a total capacity of 202.27 MW, consisting entirely of battery storage. It is listed in the California Independent System Operator (CAISO) interconnection queue under queue ID CAISO-2359, within the service territory of Southern California Edison (SCE). The data does not identify a developer. The project's proposed point of interconnection is the Antelope 230 kV substation.
The project entered the CAISO queue on April 17, 2023, and is studied as part of Cluster 15. It has requested Network Resource Interconnection Service (NRIS). Its queue status is active, and its proposed commercial operation date is June 1, 2029. Work on an interconnection agreement has not yet started.
Summary provenance
Summary generated Oct 25, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- LBNL queue source as of: Dec 31, 2025.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
CA
County
Los Angeles
Grid Region
CAISO (California)
Market
ISO/RTO Member
Developer
—
Utility
SCE
Entity
CAISO
Service Type
NRIS
Point of Interconnection
ANTELOPE 230 kV
Data Source
LBNL
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- CAISO
- Trading Hub
- TH_SP15_GEN-APND
- Hub Confidence
- MEDIUM
- Nearest Node (Estimated)
- BIGSK230_2_N022
- POI Substation
- Antelope Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No Ask reports yet for this entity.
Ask about Brundage Energy StorageForward forecasts, scenario decomposition, and risk-decision tooling for this queue project.