Brundage Energy Storage (CAISO-2359) — Project Summary

Queue ID
CAISO-2359
Capacity
202.2668 MW
Technology
Battery
Status
active
Location
Los Angeles, CA
Region
CAISO
Developer
—
IA Status
Not Started

Brundage Energy Storage

CAISO-2359BetaActiveBatteryCAISOLBNL

202.267 MW storage in Los Angeles, CA · In queue since April 2023 · Proposed COD June 2029

BA: CISOISO/RTO: CAISONERC: WECCRC: RCW

202.267 MW

Capacity

1

Components

Battery

3y 7m

In Queue

Not Started

IA Phase

COD target: 2029

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

6y 2m

Study Phase

Cluster 15

In Study38%
Queue EntryApr 17, 2023

Interconnection request submitted to ISO/RTO

Cluster Study (Phase I/II)Current

CAISO uses cluster studies where projects are batched annually and studied together.

Typical: 36–48 months (IR to IA)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2029-06-01

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Jun 1, 2029
From queue filing
Developer in saved assessment
—
Status at research time
Active
Active — Cluster 15 interconnection study phase, no IA executed, no construction timeline announced
Financing
Not recorded

Milestones in this assessment

IA executedLatest in this assessment

Cluster 15 interconnection request filed, IA not yet started per LBNL

caiso.com
Research sources and reasoning (3 recorded sources)

low confidence at research time

  1. caiso.com/documents/cluster-15-interconnection-requests.xlsx
  2. cleanview.co/power-projects/planned/battery-storage-projects/california/54697_storage/brundage-energy-storage
  3. cpuc.ca.gov/-/media/cpuc-website/divisions/energy-division/documents/integrated-resource-plan-and-long-term-procurement-plan-irp-ltpp/2024-2026-irp-cycle-events-and-materials/assumptions-for-the-2025-2026-tpp/mappingcifrom_cluster15_apps_09-25-24.xlsx

Commercial operation date: Only LBNL queue data provides a COD target of June 2029. No news sources or press releases confirm or update this date. Cleanview aggregator mirrors the LBNL date without independent verification.

Developer: LBNL queue snapshot lists developer as null. No press releases, news articles, or corporate announcements identify the project sponsor. CAISO Cluster 15 spreadsheet and aggregator sites do not name a developer.

Status: LBNL reports 'active' status with IA 'Not Started'. CAISO Cluster 15 documentation confirms the project is in the study queue at 202.27 MW connecting to SCE's Antelope 230kV substation. No withdrawal or suspension signals found.

About

Saved background

Generated Oct 25, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Brundage Energy Storage is a proposed battery energy storage development project located in Los Angeles County, California. The project has a total capacity of 202.27 MW, consisting entirely of battery storage. It is listed in the California Independent System Operator (CAISO) interconnection queue under queue ID CAISO-2359, within the service territory of Southern California Edison (SCE). The data does not identify a developer. The project's proposed point of interconnection is the Antelope 230 kV substation.

The project entered the CAISO queue on April 17, 2023, and is studied as part of Cluster 15. It has requested Network Resource Interconnection Service (NRIS). Its queue status is active, and its proposed commercial operation date is June 1, 2029. Work on an interconnection agreement has not yet started.

Summary provenance

Summary generated Oct 25, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • LBNL queue source as of: Dec 31, 2025.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

CA

County

Los Angeles

Grid Region

CAISO (California)

Market

ISO/RTO Member

Developer

—

Utility

SCE

Entity

CAISO

Service Type

NRIS

Point of Interconnection

ANTELOPE 230 kV

Data Source

LBNL

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
CAISO
Trading Hub
TH_SP15_GEN-APND
Hub Confidence
MEDIUM
Nearest Node (Estimated)
BIGSK230_2_N022
POI Substation
Antelope Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.

No Ask reports yet for this entity.

Ask about Brundage Energy Storage
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.