Cowboy (CAISO-2344) — Project Summary

Queue ID
CAISO-2344
Capacity
311.7 MW
Technology
Solar+Battery
Status
active
Location
Colusa, CA
Region
CAISO
Developer
—
IA Status
Not Started

Cowboy

CAISO-2344BetaActiveSolarBatteryCAISOLBNL

311.7 MW hybrid in Colusa, CA · In queue since April 2023 · Proposed COD June 2030

BA: CISOISO/RTO: CAISONERC: WECCRC: RCW

311.7 MW

Capacity

2

Components

Solar + Battery

3y 7m

In Queue

Not Started

IA Phase

COD target: 2030

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

7y 2m

Study Phase

Cluster 15

In Study38%
Queue EntryApr 17, 2023

Interconnection request submitted to ISO/RTO

Cluster Study (Phase I/II)Current

CAISO uses cluster studies where projects are batched annually and studied together.

Typical: 36–48 months (IR to IA)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2030-06-30

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Jun 30, 2030
From queue filing
Developer in saved assessment
—
Status at research time
Active
Active in the CAISO queue with the interconnection agreement not started. No project-specific news confirms construction or permitting.
Financing
Not recorded
Research sources and reasoning (0 recorded sources)

low confidence at research time

No source list recorded with this assessment.

Commercial operation date: Only the LBNL snapshot (proposed_cod 2030-06-30) applies to this project. All search hits on 'Cowboy' describe Enbridge's Cowboy Solar I & II in Laramie County, Wyoming (365 MW solar plus BESS for Meta), a different project from this 311.7 MW CAISO project in Colusa County, CA, so I excluded them.

Developer: LBNL lists no developer, and no search result ties a developer to the Colusa County, CA project. Enbridge is the developer of the Wyoming Cowboy project, and nothing links it to CAISO-2344, so I did not assign it.

Status: LBNL reports 'active' with ia_status 'Not Started' and no IA date. The 'Under construction' status in search results belongs to the Wyoming Cowboy project, not this one.

About

Saved background

Generated Oct 25, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The Cowboy project is a proposed hybrid solar and battery storage development project in Colusa County, California, with a total capacity of 311.7 MW. It combines a 156.4 MW solar photovoltaic component with a 155.3 MW battery energy storage component. The project would interconnect to the Pacific Gas and Electric Company (PG&E) system at the Delevan-Cortina point of interconnection. No developer has been publicly identified in the available queue data.

The project is listed as active in the California Independent System Operator (CAISO) interconnection queue under queue ID CAISO-2344. It entered the queue on April 17, 2023, and is being studied as part of CAISO's Cluster 15 study process. The project has requested Energy Resource Interconnection Service (ERIS). Its interconnection agreement has not yet been started, and its proposed commercial operation date is June 30, 2030.

Summary provenance

Summary generated Oct 25, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • LBNL queue source as of: Dec 31, 2025.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

CA

County

Colusa

Grid Region

CAISO (California)

Market

ISO/RTO Member

Developer

—

Utility

PGAE

Entity

CAISO

Service Type

ERIS

Point of Interconnection

DELEVAN-CORTINA

Data Source

LBNL

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Technology
Solar156.4 MW · 50%
Battery155.3 MW · 50%
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
CAISO
Trading Hub
TH_NP15_GEN-APND
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.