Quaking Aspen
317.545 MW hybrid in Kern, CA · In queue since April 2023 · Proposed COD July 2029
317.545 MW
Capacity
2
Components
Solar + Battery
3y 7m
In Queue
Not Started
IA Phase
COD target: 2029
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
6y 3m
Study Phase
Cluster 15
Interconnection request submitted to ISO/RTO
CAISO uses cluster studies where projects are batched annually and studied together.
Typical: 36–48 months (IR to IA)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2029-07-31
Cross-source intelligence
Experimental assessment saved at the research date. See the queue record for reported project facts.
Research sources and reasoning (3 recorded sources)
low confidence at research time
- interconnection.fyi/project/caiso-54989
- cleanview.co/power-projects/planned/battery-storage-projects/california/54989_storage/quaking-aspen
- interconnection.fyi/projects/market/CAISO
Commercial operation date: Only the LBNL queue lists a proposed COD of 2029-07-31. Cleanview echoes July 2029 but is an aggregator that likely derives from the same queue data, so it is not an independent post-LBNL signal.
Developer: LBNL developer field is null and no search result names a developer or parent company for Quaking Aspen.
Status: LBNL lists status active with IA not started, and interconnection.fyi also shows it as Active in the CAISO queue. No contradicting news was found.
About
Generated Oct 25, 2026
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
Quaking Aspen is a proposed hybrid solar and battery storage development project in Kern County, California. The project has a total capacity of 317.55 MW, made up of a 209.64 MW solar photovoltaic component and a 107.9 MW battery energy storage component. No developer is identified in the available queue data. The project would connect to the grid at the Dry Lake Switching Station at the 500 kV level, within the service territory of Pacific Gas and Electric Company (PG&E).
The project is listed as active in the California Independent System Operator (CAISO) interconnection queue under queue ID CAISO-2343. It entered the queue on April 17, 2023, and is being evaluated as part of CAISO's Cluster 15 study process. The project has requested Network Resource Interconnection Service (NRIS). Its proposed commercial operation date is July 31, 2029. As of the most recent queue data, work on an interconnection agreement had not yet started.
Summary provenance
Summary generated Oct 25, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- LBNL queue source as of: Dec 31, 2025.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
CA
County
Kern
Grid Region
CAISO (California)
Market
ISO/RTO Member
Developer
—
Utility
PGAE
Entity
CAISO
Service Type
NRIS
Point of Interconnection
DRY LAKE SW STA 500 kV
Data Source
LBNL
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- CAISO
- Trading Hub
- TH_SP15_GEN-APND
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
can you provide me with the capacity factor for allrenewable facilities in 2024
Data tables and metrics from the InfraSure database.
Quaking Aspen in ISO New England queue pipeline — 1 projects by technology and status
Data-driven briefing on Quaking Aspen — fleet, generation, financial, and news signals.
can you provide me with the capacity factor for allrenewable facilities in 2024
Data tables and metrics from the InfraSure database.
Quaking Aspen queue pipeline — 1 projects by technology and status
Data-driven briefing on Quaking Aspen — fleet, generation, financial, and news signals.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.