Quaking Aspen (CAISO-2343) — Project Summary

Queue ID
CAISO-2343
Capacity
317.545082 MW
Technology
Solar+Battery
Status
active
Location
Kern, CA
Region
CAISO
Developer
—
IA Status
Not Started

Quaking Aspen

CAISO-2343BetaActiveSolarBatteryCAISOLBNL

317.545 MW hybrid in Kern, CA · In queue since April 2023 · Proposed COD July 2029

BA: CISOISO/RTO: CAISONERC: WECCRC: RCW

317.545 MW

Capacity

2

Components

Solar + Battery

3y 7m

In Queue

Not Started

IA Phase

COD target: 2029

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

6y 3m

Study Phase

Cluster 15

In Study38%
Queue EntryApr 17, 2023

Interconnection request submitted to ISO/RTO

Cluster Study (Phase I/II)Current

CAISO uses cluster studies where projects are batched annually and studied together.

Typical: 36–48 months (IR to IA)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2029-07-31

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Jul 31, 2029
From queue filing
Developer in saved assessment
—
Status at research time
Active
Active in CAISO queue (Cluster entry 2023-04-17); IA not started; no public construction, permitting, or financing news found.
Financing
Not recorded
Research sources and reasoning (3 recorded sources)

low confidence at research time

  1. interconnection.fyi/project/caiso-54989
  2. cleanview.co/power-projects/planned/battery-storage-projects/california/54989_storage/quaking-aspen
  3. interconnection.fyi/projects/market/CAISO

Commercial operation date: Only the LBNL queue lists a proposed COD of 2029-07-31. Cleanview echoes July 2029 but is an aggregator that likely derives from the same queue data, so it is not an independent post-LBNL signal.

Developer: LBNL developer field is null and no search result names a developer or parent company for Quaking Aspen.

Status: LBNL lists status active with IA not started, and interconnection.fyi also shows it as Active in the CAISO queue. No contradicting news was found.

About

Saved background

Generated Oct 25, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Quaking Aspen is a proposed hybrid solar and battery storage development project in Kern County, California. The project has a total capacity of 317.55 MW, made up of a 209.64 MW solar photovoltaic component and a 107.9 MW battery energy storage component. No developer is identified in the available queue data. The project would connect to the grid at the Dry Lake Switching Station at the 500 kV level, within the service territory of Pacific Gas and Electric Company (PG&E).

The project is listed as active in the California Independent System Operator (CAISO) interconnection queue under queue ID CAISO-2343. It entered the queue on April 17, 2023, and is being evaluated as part of CAISO's Cluster 15 study process. The project has requested Network Resource Interconnection Service (NRIS). Its proposed commercial operation date is July 31, 2029. As of the most recent queue data, work on an interconnection agreement had not yet started.

Summary provenance

Summary generated Oct 25, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • LBNL queue source as of: Dec 31, 2025.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

CA

County

Kern

Grid Region

CAISO (California)

Market

ISO/RTO Member

Developer

—

Utility

PGAE

Entity

CAISO

Service Type

NRIS

Point of Interconnection

DRY LAKE SW STA 500 kV

Data Source

LBNL

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Technology
Solar209.643 MW · 66%
Battery107.902 MW · 34%
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
CAISO
Trading Hub
TH_SP15_GEN-APND
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.