Ulua (CAISO-2340) — Project Summary

Queue ID
CAISO-2340
Capacity
104.97 MW
Technology
Battery
Status
active
Location
Los Angeles, CA
Region
CAISO
Developer
—
IA Status
Not Started

Ulua

CAISO-2340BetaActiveBatteryCAISOLBNL

104.97 MW storage in Los Angeles, CA · In queue since April 2023 · Proposed COD June 2029

BA: CISOISO/RTO: CAISONERC: WECCRC: RCW

104.97 MW

Capacity

1

Components

Battery

3y 7m

In Queue

Not Started

IA Phase

COD target: 2029

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

6y 2m

Study Phase

Cluster 15

In Study38%
Queue EntryApr 17, 2023

Interconnection request submitted to ISO/RTO

Cluster Study (Phase I/II)Current

CAISO uses cluster studies where projects are batched annually and studied together.

Typical: 36–48 months (IR to IA)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2029-06-30

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Jun 30, 2029
From queue filing
Developer in saved assessment
—
Status at research time
Active
Active — early-stage queue position, IA not started, no construction activity announced
Financing
Not recorded

Milestones in this assessment

IA executedApr 17, 2023Latest in this assessment

Entered CAISO Cluster 15 interconnection queue as queue ID CAISO-2340

caiso.com
Research sources and reasoning (3 recorded sources)

low confidence at research time

  1. caiso.com/documents/cluster-15-interconnection-requests.xlsx
  2. cpuc.ca.gov/-/media/cpuc-website/divisions/energy-division/documents/integrated-resource-plan-and-long-term-procurement-plan-irp-ltpp/2024-2026-irp-cycle-events-and-materials/assumptions-for-the-2025-2026-tpp/mappingcifrom_cluster15_apps_09-25-24.xlsx
  3. cleanview.co/planned-battery-projects/CA/54859_storage/ulua

Commercial operation date: Only LBNL queue data provides a COD target of June 2029. Cleanview aggregator site confirms this date but appears to source from LBNL. No independent developer announcements or press releases found to validate or update this target.

Developer: LBNL filing shows no developer name. No press releases, corporate announcements, or ownership records found in search results. Project appears to be in early queue stage without public developer identification.

Status: LBNL status is 'active' with IA 'Not Started'. No news or announcements found indicating progression beyond initial queue filing. Project appears dormant in public record despite active queue status.

About

Saved background

Generated Oct 25, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Ulua is a proposed battery energy storage development project located in Los Angeles County, California. The project has a planned capacity of 104.97 MW, consisting entirely of battery storage. It is situated within the service territory of Southern California Edison (SCE) and would connect to the grid at the Eagle Rock 230 kV point of interconnection. No developer is identified in the available data.

The project is listed in the California Independent System Operator (CAISO) interconnection queue under queue ID CAISO-2340, with a queue entry date of April 17, 2023. It is being studied as part of CAISO's Cluster 15 and has requested Network Resource Interconnection Service (NRIS). As of the latest data, the project's queue status is active, but its interconnection agreement process has not yet started. The proposed commercial operation date is June 30, 2029.

Summary provenance

Summary generated Oct 25, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • LBNL queue source as of: Dec 31, 2025.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

CA

County

Los Angeles

Grid Region

CAISO (California)

Market

ISO/RTO Member

Developer

—

Utility

SCE

Entity

CAISO

Service Type

NRIS

Point of Interconnection

EAGLE ROCK 230 kV

Data Source

LBNL

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
CAISO
Trading Hub
TH_SP15_GEN-APND
Hub Confidence
MEDIUM
Nearest Node (Estimated)
GLNARMC3_7_B1
POI Substation
Eagle Rock Switchyard

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.