Comstock
398 MW hybrid in San Bernardino, CA · In queue since April 2023 · Proposed COD August 2028
398 MW
Capacity
2
Components
Gas + Battery
3y 7m
In Queue
Not Started
IA Phase
COD target: 2028
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
5y 4m
Study Phase
Cluster 15
Interconnection request submitted to ISO/RTO
CAISO uses cluster studies where projects are batched annually and studied together.
Typical: 36–48 months (IR to IA)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-08-01
Cross-source intelligence
Experimental assessment saved at the research date. See the queue record for reported project facts.
Research sources and reasoning (0 recorded sources)
low confidence at research time
No source list recorded with this assessment.
Commercial operation date: No search result describes the CAISO-2339 Comstock battery project in San Bernardino County. The Comstock hits are a Michigan township battery project (Swan and Cygnet, Kalamazoo County), a solar recycling company, and a journalist, so only the LBNL proposed COD of 2028-08-01 is available.
Developer: LBNL lists no developer and no search result names an operator for this California project. The Michigan Comstock Township project and Comstock Metals are unrelated.
Status: The LBNL status is 'active' and no matched source contradicts it. The search results are all about different 'Comstock' entities, so there is no ground-reality enrichment.
About
Generated Oct 25, 2026
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
Comstock (queue ID CAISO-2339) is a proposed hybrid energy development project located in San Bernardino County, California. The project combines natural gas generation and battery energy storage, with a total capacity of 398 MW split evenly between its two components: 199 MW of gas-fired generation and 199 MW of battery storage. The project would interconnect at the Lugo 500 kV point of interconnection within the service territory of Southern California Edison (SCE). No developer is identified in the available queue data.
The project is listed as active in the California Independent System Operator (CAISO) interconnection queue, which it entered on April 17, 2023. It is being evaluated as part of CAISO's Cluster 15 study process and has requested Network Resource Interconnection Service (NRIS). The proposed commercial operation date is August 1, 2028. As of the latest available data, the interconnection agreement process has not been started.
Summary provenance
Summary generated Oct 25, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- LBNL queue source as of: Dec 31, 2025.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
CA
County
San Bernardino
Grid Region
CAISO (California)
Market
ISO/RTO Member
Developer
—
Utility
SCE
Entity
CAISO
Service Type
NRIS
Point of Interconnection
LUGO 500 kV
Data Source
LBNL
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- CAISO
- Trading Hub
- TH_SP15_GEN-APND
- Hub Confidence
- MEDIUM
- POI Substation
- Lugo Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Battery storage queue pipeline
Summary analysis with parallel narrative sections and visualizations.
Battery Storage queue pipeline overview
Summary analysis with parallel narrative sections and visualizations.
Comstock in ISO New England queue pipeline — 1 projects by technology and status
Data-driven briefing on Comstock — fleet, generation, financial, and news signals.
Comstock queue pipeline — 1 projects by technology and status
Data-driven briefing on Comstock — fleet, generation, financial, and news signals.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.