Stanley
2,071.012 MW hybrid in Maricopa, AZ · In queue since April 2023 · Proposed COD April 2030
2,071.012 MW
Capacity
2
Components
Solar + Battery
3y 7m
In Queue
Not Started
IA Phase
COD target: 2030
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
7 years
Study Phase
Cluster 15
Interconnection request submitted to ISO/RTO
CAISO uses cluster studies where projects are batched annually and studied together.
Typical: 36–48 months (IR to IA)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2030-04-30
Cross-source intelligence
Experimental assessment saved at the research date. See the queue record for reported project facts.
Research sources and reasoning (1 recorded sources)
low confidence at research time
Commercial operation date: Only the LBNL proposed COD of 2030-04-30 is available. Cleanview says Stanley is 'expected to come online in April 2030', but that matches LBNL and is probably derived from it, so it is not independent confirmation. No developer press release or news item gives a different date.
Developer: The LBNL developer field is null and no search result names a developer for this project. A Copia Power map entry called 'Stanley' lists La Paz, AZ, not Maricopa, and has different capacities, so it cannot be attributed to this queue entry. The Morgan Stanley and Tesla hits are unrelated name matches.
Status: LBNL lists the project as active with no interconnection agreement. Cleanview still lists it as planned. Nothing indicates withdrawal or construction.
About
Generated Oct 25, 2026
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
Stanley is a proposed hybrid solar and battery storage development project in Maricopa County, Arizona, with a total capacity of 2,071.01 MW. The project combines a 1,038.9 MW solar photovoltaic component with a 1,032.11 MW battery energy storage component. It is planned to interconnect at the Cielo Azul 500 kV point of interconnection, with DCRT listed as the associated utility. No developer has been identified in the available data.
The project is in the California Independent System Operator (CAISO) interconnection queue under queue ID CAISO-2331. It entered the queue on April 17, 2023, and is being studied as part of CAISO's Cluster 15. The project has requested Energy Resource Interconnection Service (ERIS). As of the latest data, its queue status is active, but work on an interconnection agreement has not started. The proposed commercial operation date is April 30, 2030.
Summary provenance
Summary generated Oct 25, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- LBNL queue source as of: Dec 31, 2025.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
AZ
County
Maricopa
Grid Region
CAISO (California)
Market
ISO/RTO Member
Developer
—
Utility
DCRT
Entity
CAISO
Service Type
ERIS
Point of Interconnection
CIELO AZUL 500 kV
Data Source
LBNL
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- CAISO
- Trading Hub
- TH_SP15_GEN-APND
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Solar queue pipeline by status
Data tables and metrics from the InfraSure database.
Geothermal queue pipeline overview
Summary analysis with parallel narrative sections and visualizations.
Battery Storage queue pipeline by status
Data tables and metrics from the InfraSure database.
AEP Jacksonville Solar Project
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.