Torbino Solar (CAISO-2329) — Project Summary

Queue ID
CAISO-2329
Capacity
507 MW
Technology
Solar
Status
active
Location
Kern, CA
Region
CAISO
Developer
—
IA Status
Not Started

Torbino Solar

CAISO-2329BetaActiveSolarCAISOLBNL

507 MW generation in Kern, CA · In queue since April 2023 · Proposed COD March 2029

BA: CISOISO/RTO: CAISONERC: WECCRC: RCW

507 MW

Capacity

1

Components

Solar

3y 7m

In Queue

Not Started

IA Phase

COD target: 2029

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

5y 11m

Study Phase

Cluster 15

In Study38%
Queue EntryApr 17, 2023

Interconnection request submitted to ISO/RTO

Cluster Study (Phase I/II)Current

CAISO uses cluster studies where projects are batched annually and studied together.

Typical: 36–48 months (IR to IA)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2029-03-30

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Mar 30, 2029
From queue filing
Developer in saved assessment
—
Status at research time
Withdrawn
LBNL snapshot shows 'active', but interconnection.fyi lists CAISO-2329 as Withdrawn, with capacity revised to 450 MW from 507 MW. This suggests the project has left the CAISO queue.
Financing
Not recorded
Research sources and reasoning (5 recorded sources)

low confidence at research time

  1. interconnection.fyi/project/caiso-54707
  2. interconnection.fyi/projects/state/CA/kern-county
  3. interconnection.fyi/projects/market/CAISO
  4. cleanview.co/power-projects/planned/solar-farms/california/54707_photovoltaic/torbino-solar
  5. interxdata.com/projects/torbino-solar-caiso-2329/

Commercial operation date: Only the LBNL proposed COD (2029-03-30) is available. Cleanview's 'Expected online 2029' matches it but looks derived from the queue data, not an independent developer-backed target. No press releases or news give a financing-backed date.

Developer: The LBNL developer field is null and no search result names a developer, parent, or operating company.

Status: interconnection.fyi's project page and its Kern County and CAISO market listings all show Torbino Solar (2329) as Withdrawn. The revised capacity suggests a newer queue record than the LBNL snapshot. interxdata still shows 'active', and that source may mirror older data. All the withdrawal evidence comes from a single aggregator, so this is a low-confidence override.

About

Saved background

Generated Oct 25, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Torbino Solar is a proposed 507 MW solar generation project in Kern County, California. The development project is listed under queue ID CAISO-2329 in the interconnection queue of the California Independent System Operator (CAISO), with Southern California Edison (SCE) identified as the associated utility. The project would interconnect at the Windhub 500 kV point of interconnection. It consists of a single solar component, with no storage or other hybrid technologies included in the queue filing.

The project entered the CAISO queue on April 17, 2023, and is being studied as part of Cluster 15. It has requested Energy Resource Interconnection Service (ERIS) and remains in active status. Work on an interconnection agreement has not yet started. The project's proposed commercial operation date is March 30, 2029.

Summary provenance

Summary generated Oct 25, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • LBNL queue source as of: Dec 31, 2025.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

CA

County

Kern

Grid Region

CAISO (California)

Market

ISO/RTO Member

Developer

—

Utility

SCE

Entity

CAISO

Service Type

ERIS

Point of Interconnection

WINDHUB 500 kV

Data Source

LBNL

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
CAISO
Trading Hub
TH_SP15_GEN-APND
Hub Confidence
MEDIUM
Nearest Node (Estimated)
ALTA6B2_7_N003
POI Substation
Windhub Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.