Torbino Solar
507 MW generation in Kern, CA · In queue since April 2023 · Proposed COD March 2029
507 MW
Capacity
1
Components
Solar
3y 7m
In Queue
Not Started
IA Phase
COD target: 2029
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
5y 11m
Study Phase
Cluster 15
Interconnection request submitted to ISO/RTO
CAISO uses cluster studies where projects are batched annually and studied together.
Typical: 36–48 months (IR to IA)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2029-03-30
Cross-source intelligence
Experimental assessment saved at the research date. See the queue record for reported project facts.
Research sources and reasoning (5 recorded sources)
low confidence at research time
- interconnection.fyi/project/caiso-54707
- interconnection.fyi/projects/state/CA/kern-county
- interconnection.fyi/projects/market/CAISO
- cleanview.co/power-projects/planned/solar-farms/california/54707_photovoltaic/torbino-solar
- interxdata.com/projects/torbino-solar-caiso-2329/
Commercial operation date: Only the LBNL proposed COD (2029-03-30) is available. Cleanview's 'Expected online 2029' matches it but looks derived from the queue data, not an independent developer-backed target. No press releases or news give a financing-backed date.
Developer: The LBNL developer field is null and no search result names a developer, parent, or operating company.
Status: interconnection.fyi's project page and its Kern County and CAISO market listings all show Torbino Solar (2329) as Withdrawn. The revised capacity suggests a newer queue record than the LBNL snapshot. interxdata still shows 'active', and that source may mirror older data. All the withdrawal evidence comes from a single aggregator, so this is a low-confidence override.
About
Generated Oct 25, 2026
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
Torbino Solar is a proposed 507 MW solar generation project in Kern County, California. The development project is listed under queue ID CAISO-2329 in the interconnection queue of the California Independent System Operator (CAISO), with Southern California Edison (SCE) identified as the associated utility. The project would interconnect at the Windhub 500 kV point of interconnection. It consists of a single solar component, with no storage or other hybrid technologies included in the queue filing.
The project entered the CAISO queue on April 17, 2023, and is being studied as part of Cluster 15. It has requested Energy Resource Interconnection Service (ERIS) and remains in active status. Work on an interconnection agreement has not yet started. The project's proposed commercial operation date is March 30, 2029.
Summary provenance
Summary generated Oct 25, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- LBNL queue source as of: Dec 31, 2025.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
CA
County
Kern
Grid Region
CAISO (California)
Market
ISO/RTO Member
Developer
—
Utility
SCE
Entity
CAISO
Service Type
ERIS
Point of Interconnection
WINDHUB 500 kV
Data Source
LBNL
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- CAISO
- Trading Hub
- TH_SP15_GEN-APND
- Hub Confidence
- MEDIUM
- Nearest Node (Estimated)
- ALTA6B2_7_N003
- POI Substation
- Windhub Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Solar queue pipeline by status
Data tables and metrics from the InfraSure database.
Solar queue pipeline overview
Summary analysis with parallel narrative sections and visualizations.
AEP Jacksonville Solar Project
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
can you provide me with the capacity factor for allrenewable facilities in 2024
Data tables and metrics from the InfraSure database.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.