Amanece
835.538 MW hybrid in Stanislaus, CA · In queue since April 2023 · Proposed COD July 2029
835.538 MW
Capacity
2
Components
Solar + Battery
3y 7m
In Queue
Not Started
IA Phase
COD target: 2029
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
6y 3m
Study Phase
Cluster 15
Interconnection request submitted to ISO/RTO
CAISO uses cluster studies where projects are batched annually and studied together.
Typical: 36–48 months (IR to IA)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2029-07-31
Cross-source intelligence
Experimental assessment saved at the research date. See the queue record for reported project facts.
Milestones in this assessment
Cleanview lists the expected online date as July 2029, consistent with the LBNL proposed COD.
cleanview.coResearch sources and reasoning (4 recorded sources)
low confidence at research time
- cleanview.co/power-projects/planned/battery-storage-projects/california/54934_storage/amanece
- ceqanet.lci.ca.gov/2026100796
- ceqanet.lci.ca.gov/2026100796/Attachment/lT05If
- interconnection.fyi/project/caiso-54934
Commercial operation date: Only the LBNL proposed COD of 2029-07-31 is available. Cleanview's 'expected to come online in July 2029' matches it but appears to be derived from the same queue data, so it is not independent confirmation.
Developer: LBNL lists no developer. A 2026 CEQAnet county use-permit filing names 'Amanece Hybrid Solar, LLC' as the agency/applicant entity, which is a project LLC and not a confirmed parent or operating company. No parent could be identified from the sources.
Status: LBNL shows active status with no IA. The CEQAnet filings show the project is still moving through local land-use permitting, which is consistent with Active.
About
Generated Oct 25, 2026
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
Amanece is a proposed hybrid solar and battery storage development project in Stanislaus County, California, with a total capacity of 835.54 MW. It combines 418.99 MW of solar generation with 416.55 MW of battery storage. The proposed project would interconnect to the Pacific Gas and Electric Company (PG&E) system at the Quinto Switching Station–Fink Switching Station 230 kV line, which is its designated point of interconnection. No developer is identified in the available queue data.
The project is listed as active in the California Independent System Operator (CAISO) interconnection queue under queue ID CAISO-2328. It entered the queue on April 17, 2023, and is being evaluated as part of Cluster 15. The project has requested Network Resource Interconnection Service (NRIS). Its proposed commercial operation date is July 31, 2029. Negotiation of an interconnection agreement has not yet started.
Summary provenance
Summary generated Oct 25, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- LBNL queue source as of: Dec 31, 2025.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
CA
County
Stanislaus
Grid Region
CAISO (California)
Market
ISO/RTO Member
Developer
—
Utility
PGAE
Entity
CAISO
Service Type
NRIS
Point of Interconnection
QUINTO SW STA- FINK SW STA 230 kV
Data Source
LBNL
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- CAISO
- Trading Hub
- TH_NP15_GEN-APND
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Solar queue pipeline by status
Data tables and metrics from the InfraSure database.
Geothermal queue pipeline overview
Summary analysis with parallel narrative sections and visualizations.
Battery Storage queue pipeline by status
Data tables and metrics from the InfraSure database.
AEP Jacksonville Solar Project
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.