Fontus
513.99 MW storage in San Bernardino, CA · In queue since April 2023 · Proposed COD March 2031
513.99 MW
Capacity
1
Components
Battery
3y 7m
In Queue
Not Started
IA Phase
COD target: 2031
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
7y 11m
Study Phase
Cluster 15
Interconnection request submitted to ISO/RTO
CAISO uses cluster studies where projects are batched annually and studied together.
Typical: 36–48 months (IR to IA)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2031-03-31
Cross-source intelligence
Experimental assessment saved at the research date. See the queue record for reported project facts.
Research sources and reasoning (1 recorded sources)
low confidence at research time
Commercial operation date: Only the LBNL filing (proposed COD 2031-03-31) supports a date. The Cleanview listing says the project is expected online in March, but it appears to mirror the queue data and is not independent. The Westbridge 'Fontus' press releases describe a 380+ MW data centre in Colorado, a different project, so they were not used.
Developer: The LBNL developer field is null, and no search result ties a developer to the CAISO-2323 San Bernardino battery project. Westbridge's Fontus is a Colorado data centre and should not be attributed to this queue entry.
Status: LBNL lists the project as active with IA status 'Not Started'. Cleanview lists it as a planned project, which is consistent, and nothing contradicts the queue status.
About
Generated Oct 25, 2026
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
Fontus is a proposed battery energy storage development project located in San Bernardino County, California. The project has a total capacity of 513.99 MW, consisting entirely of a single battery storage component. It is planned to interconnect at the Rancho Vista 230 kV point of interconnection within the service territory of Southern California Edison (SCE). No developer is identified in the available queue data.
The project is listed in the California Independent System Operator (CAISO) interconnection queue under queue ID CAISO-2323. It entered the queue on April 17, 2023, and its status is active. Fontus is being evaluated as part of CAISO's Cluster 15 study phase and has requested Network Resource Interconnection Service (NRIS). The proposed commercial operation date is March 31, 2031. Its interconnection agreement (IA) status is listed as "Not Started," which indicates the project has not yet begun negotiating an interconnection agreement.
Summary provenance
Summary generated Oct 25, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- LBNL queue source as of: Dec 31, 2025.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
CA
County
San Bernardino
Grid Region
CAISO (California)
Market
ISO/RTO Member
Developer
—
Utility
SCE
Entity
CAISO
Service Type
NRIS
Point of Interconnection
RANCHO VISTA 230 kV
Data Source
LBNL
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- CAISO
- Trading Hub
- TH_SP15_GEN-APND
- Hub Confidence
- MEDIUM
- Nearest Node (Estimated)
- ETIWANDA_6_N006
- POI Substation
- Rancho Vista Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Battery Storage queue pipeline by status
Data tables and metrics from the InfraSure database.
Battery storage queue pipeline
Summary analysis with parallel narrative sections and visualizations.
Battery Storage queue pipeline overview
Summary analysis with parallel narrative sections and visualizations.
Fontus queue pipeline — 1 projects by technology and status
Data-driven briefing on Fontus — fleet, generation, financial, and news signals.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.