Sunvine
613.7 MW hybrid in Kern, CA · In queue since April 2023 · Proposed COD March 2031
613.7 MW
Capacity
1
Components
Solar
3y 7m
In Queue
Not Started
IA Phase
COD target: 2031
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
7y 11m
Study Phase
Cluster 15
Interconnection request submitted to ISO/RTO
CAISO uses cluster studies where projects are batched annually and studied together.
Typical: 36–48 months (IR to IA)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2031-03-01
Cross-source intelligence
Experimental assessment saved at the research date. See the queue record for reported project facts.
Research sources and reasoning (3 recorded sources)
low confidence at research time
- interconnection.fyi/project/caiso-54902
- interconnection.fyi/projects/market/CAISO
- stproportalcorporativo.blob.core.windows.net/uploads/2026/02/DOC-5-Naturgy_CONSO_2025_ENG.pdf
Commercial operation date: Only the LBNL/CAISO queue date (2031-03-01) exists. No news or press release gives a developer COD target, and the search results are mostly unrelated 'Sunvine' businesses.
Developer: LBNL lists no developer. The Naturgy 2025 audit report lists a 'Sunvine Energy Project, LLC', incorporated 8 October and 100% owned. The name matches, but the snippet gives no location, MW or queue ID, so I can't confirm it is this Kern County project. I treat it as an unconfirmed lead and don't assign a developer.
Status: interconnection.fyi mirrors the LBNL/CAISO listing of the project as Active. No source suggests withdrawal or construction.
About
Generated Oct 25, 2026
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
Sunvine is a proposed hybrid solar and battery storage development project in Kern County, California, with a total capacity of 613.7 MW. The project data lists a solar component of 613.7 MW. A battery component is included in its technology designation, but its capacity is not specified. The developer has not been identified in available records. The project would connect to the transmission system at the Magunden-Pastoria No. 3 point of interconnection, within the service territory of Southern California Edison (SCE).
The project entered the California Independent System Operator (CAISO) interconnection queue on April 17, 2023, under queue ID CAISO-2319. It is being studied as part of Cluster 15 and has requested Energy Resource Interconnection Service (ERIS). Its queue status is active, and its proposed commercial operation date is March 1, 2031. As of the most recent data, work on the project's interconnection agreement had not started.
Summary provenance
Summary generated Oct 25, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- LBNL queue source as of: Dec 31, 2025.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
CA
County
Kern
Grid Region
CAISO (California)
Market
ISO/RTO Member
Developer
—
Utility
SCE
Entity
CAISO
Service Type
ERIS
Point of Interconnection
MAGUNDEN-PASTORIA NO.3
Data Source
LBNL
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- CAISO
- Trading Hub
- TH_SP15_GEN-APND
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Solar queue pipeline by status
Data tables and metrics from the InfraSure database.
Geothermal queue pipeline overview
Summary analysis with parallel narrative sections and visualizations.
Battery Storage queue pipeline by status
Data tables and metrics from the InfraSure database.
AEP Jacksonville Solar Project
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.