Twinkle
303.95 MW storage in San Bernardino, CA · In queue since April 2023 · Proposed COD April 2031
303.95 MW
Capacity
1
Components
Battery
3y 7m
In Queue
Not Started
IA Phase
COD target: 2031
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
8 years
Study Phase
Cluster 15
Interconnection request submitted to ISO/RTO
CAISO uses cluster studies where projects are batched annually and studied together.
Typical: 36–48 months (IR to IA)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2031-04-01
Cross-source intelligence
Experimental assessment saved at the research date. See the queue record for reported project facts.
Research sources and reasoning (2 recorded sources)
low confidence at research time
- cleanview.co/power-projects/planned/battery-storage-projects/california/54943_storage/twinkle
- interconnection.fyi/project/caiso-54943
Commercial operation date: Only queue-derived data exists. Cleanview and interconnection.fyi both repeat the LBNL/CAISO proposed completion date (April 2031 / March 31, 2031). No developer press release or news item gives an independent target.
Developer: LBNL developer field is null and no search result names a developer for this project. The other results are unrelated (string lights, a bankrupt residential solar installer, a person named Twinkle).
Status: LBNL lists the project as active with IA status 'Not Started'. Cleanview lists it as 'planned', and no contradicting signals were found.
About
Generated Oct 25, 2026
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
Twinkle is a proposed battery energy storage development project in San Bernardino County, California, with a total capacity of 303.95 MW. The project consists of a single battery component and is classified as a storage project. It is located within the service territory of Southern California Edison (SCE) and would connect to the grid at the Mira Loma 230 kV point of interconnection. No developer is identified in the available data.
The project is listed as active in the California Independent System Operator (CAISO) interconnection queue under queue ID CAISO-2317, which it entered on April 17, 2023. It is being studied as part of CAISO's Cluster 15 and has requested Network Resource Interconnection Service (NRIS). As of the latest data, work on an interconnection agreement has not started. The project's proposed commercial operation date is April 1, 2031.
Summary provenance
Summary generated Oct 25, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- LBNL queue source as of: Dec 31, 2025.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
CA
County
San Bernardino
Grid Region
CAISO (California)
Market
ISO/RTO Member
Developer
—
Utility
SCE
Entity
CAISO
Service Type
NRIS
Point of Interconnection
MIRA LOMA 230 kV
Data Source
LBNL
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- CAISO
- Trading Hub
- TH_SP15_GEN-APND
- Hub Confidence
- MEDIUM
- Nearest Node (Estimated)
- MIRALOMA_6_N001
- POI Substation
- Mira Loma Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Battery storage queue pipeline
Summary analysis with parallel narrative sections and visualizations.
Battery Storage queue pipeline overview
Summary analysis with parallel narrative sections and visualizations.
Battery Storage queue pipeline overview
Summary analysis with parallel narrative sections and visualizations.
Battery Storage queue pipeline overview
Summary analysis with parallel narrative sections and visualizations.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.