Musketeers
1,046.503 MW hybrid in Tulare, CA · In queue since April 2023 · Proposed COD July 2029
1,046.503 MW
Capacity
2
Components
Solar + Battery
3y 7m
In Queue
Not Started
IA Phase
COD target: 2029
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
6y 3m
Study Phase
Cluster 15
Interconnection request submitted to ISO/RTO
CAISO uses cluster studies where projects are batched annually and studied together.
Typical: 36–48 months (IR to IA)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2029-07-31
Cross-source intelligence
Experimental assessment saved at the research date. See the queue record for reported project facts.
Research sources and reasoning (3 recorded sources)
low confidence at research time
- interconnection.fyi/projects/market/CAISO
- cleanview.co/power-projects/planned/solar-farms/california/55025_photovoltaic/musketeers
- cleanview.co/power-projects/planned/battery-storage-projects/california/55025_storage/musketeers
Commercial operation date: The only COD signal is the LBNL proposed COD of 2029-07-31. Cleanview lists 'expected to come online in July 2029' for the storage component, but that looks derived from the same CAISO queue data rather than a developer-backed target. No developer or press-release COD was found.
Developer: LBNL lists no developer, and none of the search results (mostly unrelated 'Musketeers' hits) name an operating company for this project.
Status: interconnection.fyi, a live queue aggregator, lists queue 2312 as 'Withdrawn', which is newer than the LBNL snapshot. Cleanview still shows the project as planned, but it may lag the queue. This is a single-source correction, so confidence is low.
About
Generated Oct 25, 2026
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
Musketeers (queue ID CAISO-2312) is a proposed hybrid solar and battery storage development project located in Tulare County, California. The project has a total capacity of 1,046.5 MW, consisting of a 524.48 MW solar photovoltaic component paired with a 522.02 MW battery energy storage component. It is planned to interconnect at the Magunden-Springville No.1 220 kV point of interconnection within the service territory of Southern California Edison (SCE).
The project entered the California Independent System Operator (CAISO) interconnection queue on April 17, 2023, and is being studied as part of Cluster 15. It has requested Energy Resource Interconnection Service (ERIS). As of the latest available data, the project's queue status is active, and its interconnection agreement has not yet been started. The proposed commercial operation date is July 31, 2029.
Summary provenance
Summary generated Oct 25, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- LBNL queue source as of: Dec 31, 2025.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
CA
County
Tulare
Grid Region
CAISO (California)
Market
ISO/RTO Member
Developer
—
Utility
SCE
Entity
CAISO
Service Type
ERIS
Point of Interconnection
Magunden-Springville No.1 220 kV
Data Source
LBNL
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- CAISO
- Trading Hub
- TH_ZP26_GEN-APND
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Solar queue pipeline by status
Data tables and metrics from the InfraSure database.
Geothermal queue pipeline overview
Summary analysis with parallel narrative sections and visualizations.
Battery Storage queue pipeline by status
Data tables and metrics from the InfraSure database.
AEP Jacksonville Solar Project
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.