Chronos Energy Storage
516.8 MW storage in San Bernardino, CA · In queue since April 2023 · Proposed COD November 2031
516.8 MW
Capacity
1
Components
Other Storage
3y 7m
In Queue
Not Started
IA Phase
COD target: 2031
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
8y 7m
Study Phase
Cluster 15
Interconnection request submitted to ISO/RTO
CAISO uses cluster studies where projects are batched annually and studied together.
Typical: 36–48 months (IR to IA)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2031-11-30
Cross-source intelligence
Experimental assessment saved at the research date. See the queue record for reported project facts.
Research sources and reasoning (3 recorded sources)
low confidence at research time
- interconnection.fyi/project/caiso-55012
- interxdata.com/projects/chronos-energy-storage-caiso-2306/
- cleanview.co/power-projects/planned/battery-storage-projects/california/55012_storage/chronos-energy-storage
Commercial operation date: Only the LBNL filing gives a COD (2031-11-30). Aggregators such as Cleanview and interconnection.fyi repeat the queue date (2031, Nov 29 2031), so they are not independent confirmation. No developer press release or news item gives a different date.
Developer: The LBNL developer field is null and no search result ties a developer to CAISO-2306. Aurora's Chronos software and Chronos Energy (powered land for AI) are unrelated entities matched on name only.
Status: LBNL lists the project as active, and interxdata (Jul 2026) and interconnection.fyi both show it active. No evidence of withdrawal or progress beyond the queue stage.
About
Generated Oct 25, 2026
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
Chronos Energy Storage is a proposed battery energy storage development project located in San Bernardino County, California. The project has a total planned capacity of 516.8 MW, consisting of a single storage component classified as "Other Storage." It is situated within the service territory of Southern California Edison (SCE) and is proposed to interconnect at the Lugo 500 kV point of interconnection. No developer is identified in the available queue data.
The project is listed in the California Independent System Operator (CAISO) interconnection queue under queue ID CAISO-2306, which it entered on April 17, 2023. It remains in active status and is being evaluated as part of CAISO's Cluster 15 study process. The project has requested Network Resource Interconnection Service (NRIS). As of the latest available data, its interconnection agreement has not been started. The proposed commercial operation date is November 30, 2031.
Summary provenance
Summary generated Oct 25, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- LBNL queue source as of: Dec 31, 2025.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
CA
County
San Bernardino
Grid Region
CAISO (California)
Market
ISO/RTO Member
Developer
—
Utility
SCE
Entity
CAISO
Service Type
NRIS
Point of Interconnection
LUGO 500 kV
Data Source
LBNL
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- CAISO
- Trading Hub
- TH_SP15_GEN-APND
- Hub Confidence
- MEDIUM
- POI Substation
- Lugo Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Battery Storage queue pipeline by status
Data tables and metrics from the InfraSure database.
Battery storage queue pipeline
Summary analysis with parallel narrative sections and visualizations.
Battery Storage queue pipeline overview
Summary analysis with parallel narrative sections and visualizations.
Chronos Energy Storage
Data-driven briefing on Chronos Energy Storage — fleet, generation, financial, and news signals.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.