Saguaro Energy Storage (CAISO-2302) — Project Summary

Queue ID
CAISO-2302
Capacity
204.93 MW
Technology
Battery
Status
active
Location
San Bernardino, CA
Region
CAISO
Developer
—
IA Status
Not Started

Saguaro Energy Storage

CAISO-2302BetaActiveBatteryCAISOLBNL

204.93 MW storage in San Bernardino, CA · In queue since April 2023 · Proposed COD June 2029

BA: CISOISO/RTO: CAISONERC: WECCRC: RCW

204.93 MW

Capacity

1

Components

Battery

3y 7m

In Queue

Not Started

IA Phase

COD target: 2029

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

6y 2m

Study Phase

Cluster 15

In Study38%
Queue EntryApr 17, 2023

Interconnection request submitted to ISO/RTO

Cluster Study (Phase I/II)Current

CAISO uses cluster studies where projects are batched annually and studied together.

Typical: 36–48 months (IR to IA)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2029-06-01

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Jun 1, 2029
From queue filing
Developer in saved assessment
—
Status at research time
Active
Active in CAISO queue — no evidence of construction activity or permitting progress; project appears to be in early development with no public announcements
Financing
Not recorded
Research sources and reasoning (4 recorded sources)

low confidence at research time

  1. cleanview.co/power-projects/planned/battery-storage-projects/california/54866_storage/saguaro-energy-storage
  2. renewablesinfo.org/project/caiso-54866-saguaro-energy-storage
  3. caiso.com/documents/cluster-15-interconnection-requests.xlsx
  4. interconnection.fyi/project/caiso-54866

Commercial operation date: Only LBNL queue snapshot provides a COD target of June 2029. No news or research sources mention project timeline or construction plans.

Developer: LBNL snapshot lists developer as null. No news articles, press releases, or web sources identify the project developer or owner.

Status: LBNL shows 'active' status with IA 'Not Started'. No news coverage of this specific San Bernardino project; search results primarily returned unrelated Escondido 'Seguro' project and generic database listings.

About

Saved background

Generated Oct 25, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Saguaro Energy Storage is a proposed battery energy storage development project located in San Bernardino County, California. The project has a total planned capacity of 204.93 MW, consisting entirely of battery storage. It is listed in the interconnection queue of the California Independent System Operator (CAISO) under queue ID CAISO-2302. It would connect to the Southern California Edison (SCE) system at the Chino 230 kV point of interconnection. No developer is identified in the available data.

The project entered the CAISO queue on April 17, 2023, and its queue status is active. It is being studied as part of CAISO's Cluster 15 and has requested Network Resource Interconnection Service (NRIS). As of the latest available data, its interconnection agreement status is listed as "Not Started." The proposed commercial operation date is June 1, 2029.

Summary provenance

Summary generated Oct 25, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • LBNL queue source as of: Dec 31, 2025.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

CA

County

San Bernardino

Grid Region

CAISO (California)

Market

ISO/RTO Member

Developer

—

Utility

SCE

Entity

CAISO

Service Type

NRIS

Point of Interconnection

CHINO 230 kV

Data Source

LBNL

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
CAISO
Trading Hub
TH_SP15_GEN-APND
Hub Confidence
MEDIUM
Nearest Node (Estimated)
CHINO_6_N007
POI Substation
Chino Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.