TENDRIL (CAISO-2301) — Project Summary

Queue ID
CAISO-2301
Capacity
200 MW
Technology
Solar+Battery
Status
active
Location
Kern, CA
Region
CAISO
Developer
—
IA Status
Not Started

TENDRIL

CAISO-2301BetaActiveSolarBatteryCAISOLBNL

200 MW hybrid in Kern, CA · In queue since April 2023 · Proposed COD December 2031

BA: CISOISO/RTO: CAISONERC: WECCRC: RCW

200 MW

Capacity

2

Components

Solar + Battery

3y 7m

In Queue

Not Started

IA Phase

COD target: 2031

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

8y 8m

Study Phase

Cluster 15

In Study38%
Queue EntryApr 17, 2023

Interconnection request submitted to ISO/RTO

Cluster Study (Phase I/II)Current

CAISO uses cluster studies where projects are batched annually and studied together.

Typical: 36–48 months (IR to IA)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2031-12-31

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Dec 2031
From queue filing
Developer in saved assessment
—
Status at research time
Active
Active — queue position maintained, but no public development activity or developer identity disclosed as of early 2025
Financing
Not recorded
Research sources and reasoning (4 recorded sources)

low confidence at research time

  1. cleanview.co/power-projects/planned/battery-storage-projects/california/54652_storage/tendril
  2. interconnection.fyi/project/caiso-54652
  3. infrasure.ai/project/caiso-54652-tendril
  4. cpuc.ca.gov/-/media/cpuc-website/divisions/energy-division/documents/integrated-resource-plan-and-long-term-procurement-plan-irp-ltpp/2024-2026-irp-cycle-events-and-materials/assumptions-for-the-2025-2026-tpp/mappingcifrom_cluster15_apps_09-25-24.xlsx

Commercial operation date: LBNL queue filing shows December 2031 COD. Multiple third-party aggregators (Cleanview, InfraSure, interconnection.fyi) echo this date but provide no independent developer confirmation or press releases. No news coverage of this specific project exists.

Developer: LBNL filing lists no developer. Search results only returned unrelated companies named 'Tendril' (a home energy software firm acquired/invested in by SunPower, Schneider, etc.). No press releases, permits, or corporate announcements link any developer to this 200 MW Kern County solar+storage project.

Status: LBNL status is 'active' with IA 'Not Started'. No withdrawal or suspension signals found. However, complete absence of developer disclosure, permits, or financing announcements suggests early-stage placeholder status.

About

Saved background

Generated Oct 25, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

TENDRIL is a proposed hybrid solar and battery storage development project located in Kern County, California. The project has a total capacity of 200 MW, consisting of a 100 MW solar photovoltaic component paired with a 100 MW battery energy storage component. It is situated within the service territory of Pacific Gas and Electric Company (PG&E), and its proposed point of interconnection is the Arco-Midway transmission facility. No developer is identified in the available queue data.

The project is listed as active in the California Independent System Operator (CAISO) interconnection queue under queue ID CAISO-2301. It entered the queue on April 17, 2023, and is being studied as part of CAISO's Cluster 15 study process. The project has requested Energy Resource Interconnection Service (ERIS). As of the latest available data, negotiation of an interconnection agreement has not started. The project's proposed commercial operation date is December 31, 2031.

Summary provenance

Summary generated Oct 25, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • LBNL queue source as of: Dec 31, 2025.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

CA

County

Kern

Grid Region

CAISO (California)

Market

ISO/RTO Member

Developer

—

Utility

PGAE

Entity

CAISO

Service Type

ERIS

Point of Interconnection

ARCO-MIDWAY

Data Source

LBNL

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Technology
Solar100 MW · 50%
Battery100 MW · 50%
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
CAISO
Trading Hub
TH_SP15_GEN-APND
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.