Blue Star
513.155 MW hybrid in Kings, CA · In queue since April 2023 · Proposed COD March 2029
513.155 MW
Capacity
2
Components
Solar + Battery
3y 7m
In Queue
Not Started
IA Phase
COD target: 2029
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
5y 11m
Study Phase
Cluster 15
Interconnection request submitted to ISO/RTO
CAISO uses cluster studies where projects are batched annually and studied together.
Typical: 36–48 months (IR to IA)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2029-03-30
Cross-source intelligence
Experimental assessment saved at the research date. See the queue record for reported project facts.
Research sources and reasoning (1 recorded sources)
low confidence at research time
Commercial operation date: Only the LBNL filing (proposed COD 2029-03-30) is a project-specific source. The Cleanview listing (March 2029, 207 MW storage component) repeats the same date and is likely derived from the queue data, so it is not an independent post-LBNL signal.
Developer: LBNL developer field is null and no search result identifies a developer for the Blue Star solar+storage project in Kings County, CA. The other 'Blue Star' hits (Blue Star Gas, Blue Star Industrial Solutions, etc.) are unrelated companies.
Status: LBNL status is active, ia_status is 'Not Started', and the only project-specific web result (Cleanview) lists it as planned, which is consistent with an active queue entry.
About
Generated Oct 25, 2026
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
Blue Star is a proposed hybrid solar and battery storage development project in Kings County, California. The project has a total capacity of 513.15 MW, made up of a 306.35 MW solar photovoltaic component and a 206.8 MW battery energy storage component. It is located within the service territory of Pacific Gas and Electric Company (PG&E). The project would connect to the grid at the Dry Lake Switching Station 500 kV point of interconnection.
The project is listed in the California Independent System Operator (CAISO) interconnection queue under queue ID CAISO-2298 and holds active status. It entered the queue on April 17, 2023, and is being evaluated as part of CAISO's Cluster 15 study process. The project has requested Network Resource Interconnection Service (NRIS). As of the latest available data, its interconnection agreement has not been started. The proposed commercial operation date is March 30, 2029.
Summary provenance
Summary generated Oct 25, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- LBNL queue source as of: Dec 31, 2025.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
CA
County
Kings
Grid Region
CAISO (California)
Market
ISO/RTO Member
Developer
—
Utility
PGAE
Entity
CAISO
Service Type
NRIS
Point of Interconnection
DRY LAKE SW STA 500 kV
Data Source
LBNL
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- CAISO
- Trading Hub
- TH_ZP26_GEN-APND
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- SOLBLU_7_NBT1
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Solar queue pipeline by status
Data tables and metrics from the InfraSure database.
Battery Storage queue pipeline by status
Data tables and metrics from the InfraSure database.
AEP Jacksonville Solar Project
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
can you provide me with the capacity factor for allrenewable facilities in 2024
Data tables and metrics from the InfraSure database.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.