Dove Cove
514.368 MW storage in San Joaquin, CA · In queue since April 2023 · Proposed COD March 2031
514.368 MW
Capacity
1
Components
Battery
3y 7m
In Queue
Not Started
IA Phase
COD target: 2031
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
7y 11m
Study Phase
Cluster 15
Interconnection request submitted to ISO/RTO
CAISO uses cluster studies where projects are batched annually and studied together.
Typical: 36–48 months (IR to IA)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2031-03-14
Cross-source intelligence
Experimental assessment saved at the research date. See the queue record for reported project facts.
Research sources and reasoning (4 recorded sources)
low confidence at research time
- interconnection.fyi/project/caiso-54774
- interxdata.com/projects/dove-cove-caiso-2286/
- app.nrgmap.com/queues/caiso-2286
- interconnection.fyi/projects/market/CAISO
Commercial operation date: Only queue-aggregator pages (interconnection.fyi, interXdata) were found, and they just repeat the LBNL/CAISO proposed completion date of March 14, 2031. No press release or news gives an independent developer target.
Developer: The LBNL developer field is null and no search result names a developer or parent company. The other results are unrelated (HOA, real estate, hotel and court documents).
Status: LBNL lists the project as active, and the aggregators (NRG Map, interXdata, interconnection.fyi) all show active with no material changes. No contradicting news was found.
About
Generated Oct 25, 2026
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
Dove Cove is a proposed battery energy storage development project in San Joaquin County, California, with a total capacity of 514.37 MW. The project consists of a single battery storage component and is located within the service territory of Pacific Gas and Electric Company (PG&E). It is proposed to interconnect at the Tesla 500 kV point of interconnection. No developer has been publicly identified in the queue data.
The project is listed in the California Independent System Operator (CAISO) interconnection queue under queue ID CAISO-2286 and holds an active status. It entered the queue on April 17, 2023, and is being studied as part of CAISO's Cluster 15. The project has requested Network Resource Interconnection Service (NRIS). Its proposed commercial operation date is March 14, 2031. The interconnection agreement process has not yet started.
Summary provenance
Summary generated Oct 25, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- LBNL queue source as of: Dec 31, 2025.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
CA
County
San Joaquin
Grid Region
CAISO (California)
Market
ISO/RTO Member
Developer
—
Utility
PGAE
Entity
CAISO
Service Type
NRIS
Point of Interconnection
TESLA 500 kV
Data Source
LBNL
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- CAISO
- Trading Hub
- TH_NP15_GEN-APND
- Hub Confidence
- MEDIUM
- Nearest Node (Estimated)
- TESLA_1_B1
- POI Substation
- Tesla Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Battery Storage queue pipeline by status
Data tables and metrics from the InfraSure database.
Battery storage queue pipeline
Summary analysis with parallel narrative sections and visualizations.
Battery Storage queue pipeline overview
Summary analysis with parallel narrative sections and visualizations.
Dove Cove
Data-driven briefing on Dove Cove — fleet, generation, financial, and news signals.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.