Tea Leaf Energy Storage (CAISO-2285) — Project Summary

Queue ID
CAISO-2285
Capacity
404.31 MW
Technology
Battery
Status
active
Location
Alameda, CA
Region
CAISO
Developer
—
IA Status
Not Started

Tea Leaf Energy Storage

CAISO-2285BetaActiveBatteryCAISOLBNL

404.31 MW storage in Alameda, CA · In queue since April 2023 · Proposed COD June 2030

BA: CISOISO/RTO: CAISONERC: WECCRC: RCW

404.31 MW

Capacity

1

Components

Battery

3y 7m

In Queue

Not Started

IA Phase

COD target: 2030

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

7y 2m

Study Phase

Cluster 15

In Study38%
Queue EntryApr 17, 2023

Interconnection request submitted to ISO/RTO

Cluster Study (Phase I/II)Current

CAISO uses cluster studies where projects are batched annually and studied together.

Typical: 36–48 months (IR to IA)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2030-06-01

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Jun 1, 2030
From queue filing
Developer in saved assessment
—
Status at research time
Withdrawn
LBNL snapshot shows active, but the newer interconnection.fyi (GridTracker) queue listing shows CAISO-2285 Tea Leaf Energy Storage (Alameda County) as Withdrawn.
Financing
Cancelled
Research sources and reasoning (1 recorded sources)

low confidence at research time

  1. interconnection.fyi/projects/market/CAISO

Commercial operation date: Only the LBNL snapshot gives a COD (2030-06-01). No developer press release or news article gives a different target. The interconnection.fyi listing shows the project as Withdrawn, so this COD is likely moot.

Developer: LBNL developer field is null and no source names a developer. The 'New Leaf Energy' (Watsonville), Longroad and Invenergy results are different projects in other counties, so I did not link them to Tea Leaf.

Status: The interconnection.fyi listing is the only source that mentions this project by name, and it shows Withdrawn. That is more recent than the LBNL snapshot, which still shows active. Only a listing snippet supports it, so confidence is limited.

About

Saved background

Generated Oct 25, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Tea Leaf Energy Storage is a proposed battery energy storage development project located in Alameda County, California. The project has a total capacity of 404.31 MW, consisting entirely of battery storage. It is planned to interconnect at the Tesla 230 kV point of interconnection within the service territory of Pacific Gas and Electric Company (PG&E). No developer is identified in the available data.

The project is listed in the California Independent System Operator (CAISO) interconnection queue under queue ID CAISO-2285 and holds an active status. It entered the queue on April 17, 2023, and is being evaluated as part of CAISO's Cluster 15 study process. The project has requested Network Resource Interconnection Service (NRIS). Its interconnection agreement has not yet been started, and its proposed commercial operation date is June 1, 2030.

Summary provenance

Summary generated Oct 25, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • LBNL queue source as of: Dec 31, 2025.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

CA

County

Alameda

Grid Region

CAISO (California)

Market

ISO/RTO Member

Developer

—

Utility

PGAE

Entity

CAISO

Service Type

NRIS

Point of Interconnection

TESLA 230 kV

Data Source

LBNL

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
CAISO
Trading Hub
TH_NP15_GEN-APND
Hub Confidence
MEDIUM
Nearest Node (Estimated)
TESLA_1_B1
POI Substation
Tesla Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.