Cantus (CAISO-2280) — Project Summary

Queue ID
CAISO-2280
Capacity
499.048 MW
Technology
Solar+Battery
Status
active
Location
Merced, CA
Region
CAISO
Developer
—
IA Status
Not Started

Cantus

CAISO-2280BetaActiveSolarBatteryCAISOLBNL

499.048 MW hybrid in Merced, CA · In queue since April 2023 · Proposed COD March 2031

BA: CISOISO/RTO: CAISONERC: WECCRC: RCW

499.048 MW

Capacity

2

Components

Solar + Battery

3y 7m

In Queue

Not Started

IA Phase

COD target: 2031

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

7y 11m

Study Phase

Cluster 15

In Study38%
Queue EntryApr 17, 2023

Interconnection request submitted to ISO/RTO

Cluster Study (Phase I/II)Current

CAISO uses cluster studies where projects are batched annually and studied together.

Typical: 36–48 months (IR to IA)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2031-03-14

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Mar 14, 2031
From queue filing
Developer in saved assessment
—
Status at research time
Active
Active in the CAISO queue (#2280, Merced County, 499 MW solar+battery); interconnection agreement not started, with no public sign of construction or financing.
Financing
Not recorded
Research sources and reasoning (2 recorded sources)

low confidence at research time

  1. interconnection.fyi/projects/market/CAISO
  2. interconnection.fyi/projects/state/CA/merced-county

Commercial operation date: Only the LBNL snapshot gives a COD (proposed 2031-03-14). The live search results about the project only restate the queue listing (interconnection.fyi, Cantus, #2280, Active), and the rest are unrelated music and academic hits.

Developer: LBNL lists no developer, and no search result names a developer or operating company for the Cantus solar+storage project.

Status: LBNL status is active, and the interconnection.fyi listings show Cantus #2280 as Active. Nothing indicates withdrawal or construction.

About

Saved background

Generated Oct 25, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Cantus is a proposed hybrid solar and battery storage development project located in Merced County, California. The project has a total capacity of 499.05 MW, consisting of a 249.52 MW solar photovoltaic component paired with a 249.52 MW battery energy storage component. The project would interconnect at the Fink Switching Station 230 kV point of interconnection within the service territory of Pacific Gas and Electric Company (PG&E).

The project is listed as active in the California Independent System Operator (CAISO) interconnection queue under queue ID CAISO-2280. It entered the queue on April 17, 2023, and is being evaluated as part of CAISO's Cluster 15 study process. The project has requested Network Resource Interconnection Service (NRIS). As of the latest available data, an interconnection agreement has not yet been started. The proposed commercial operation date is March 14, 2031.

Summary provenance

Summary generated Oct 25, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • LBNL queue source as of: Dec 31, 2025.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

CA

County

Merced

Grid Region

CAISO (California)

Market

ISO/RTO Member

Developer

—

Utility

PGAE

Entity

CAISO

Service Type

NRIS

Point of Interconnection

FINK SW STA 230 kV

Data Source

LBNL

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Technology
Solar249.524 MW · 50%
Battery249.524 MW · 50%
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
CAISO
Trading Hub
TH_ZP26_GEN-APND
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.