Nelson (CAISO-2269) — Project Summary

Queue ID
CAISO-2269
Capacity
103.74 MW
Technology
Solar
Status
active
Location
Nye, NV
Region
CAISO
Developer
—
IA Status
Not Started

Nelson

CAISO-2269BetaActiveSolarCAISOLBNL

103.74 MW generation in Nye, NV · In queue since April 2023 · Proposed COD June 2031

BA: NEVPISO/RTO: CAISONERC: WECCRC: SPPW

103.74 MW

Capacity

1

Components

Solar

3y 7m

In Queue

Not Started

IA Phase

COD target: 2031

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

8y 2m

Study Phase

Cluster 15

In Study38%
Queue EntryApr 17, 2023

Interconnection request submitted to ISO/RTO

Cluster Study (Phase I/II)Current

CAISO uses cluster studies where projects are batched annually and studied together.

Typical: 36–48 months (IR to IA)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2031-06-01

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Jun 2031
From queue filing
Developer in saved assessment
—
Status at research time
Active
Active — no public development activity detected; likely early-stage queue placeholder
Financing
Not recorded
Research sources and reasoning (1 recorded sources)

low confidence at research time

  1. cleanview.co/power-projects/planned/solar-farms/nevada/54733_photovoltaic/nelson

Commercial operation date: Only LBNL queue data provides a COD of June 2031. No news articles or press releases discuss this specific project's timeline. Cleanview aggregator mirrors LBNL data.

Developer: LBNL filing shows no developer. Search results contain no press releases, financing announcements, or corporate disclosures identifying the project sponsor. All results are unrelated (lithium mining, residential solar installers, obituaries).

Status: LBNL status is 'active' with IA 'Not Started'. Zero news coverage or construction announcements suggest this remains a speculative queue position with no visible ground activity.

About

Saved background

Generated Oct 25, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Nelson is a proposed solar generation project located in Nye County, Nevada, with a total planned capacity of 103.74 megawatts (MW). The development project consists of a single solar photovoltaic component and does not include battery storage or other hybrid elements. No developer is identified in the available interconnection data. The project is associated with the GLW utility service area and is proposed to connect to the grid at the Valley Switch 230 kV substation.

The project is listed in the California Independent System Operator (CAISO) interconnection queue under queue ID CAISO-2269. It entered the queue on April 17, 2023, and is being evaluated as part of CAISO's Cluster 15 study process. The project has requested Energy Resource Interconnection Service (ERIS). As of the latest available data, its queue status is active and its interconnection agreement has not yet been started. The proposed commercial operation date is June 1, 2031.

Summary provenance

Summary generated Oct 25, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • LBNL queue source as of: Dec 31, 2025.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

NV

County

Nye

Grid Region

CAISO (California)

Market

ISO/RTO Member

Developer

—

Utility

GLW

Entity

CAISO

Service Type

ERIS

Point of Interconnection

VALLEY SWITCH 230 kV

Data Source

LBNL

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
CAISO
Trading Hub
TH_NP15_GEN-APND
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.