Quark
2,044.7 MW hybrid in Fresno, CA · In queue since April 2023 · Proposed COD September 2028
2,044.7 MW
Capacity
2
Components
Solar + Battery
3y 7m
In Queue
Not Started
IA Phase
COD target: 2028
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
5y 5m
Study Phase
Cluster 15
Interconnection request submitted to ISO/RTO
CAISO uses cluster studies where projects are batched annually and studied together.
Typical: 36–48 months (IR to IA)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-09-30
Cross-source intelligence
Experimental assessment saved at the research date. See the queue record for reported project facts.
Research sources and reasoning (3 recorded sources)
low confidence at research time
- interconnection.fyi/project/caiso-54636
- interconnection.fyi/projects/market/CAISO
- cleanview.co/power-projects/planned/battery-storage-projects/caiso
Commercial operation date: Only the LBNL proposed COD (2028-09-30) is available. Cleanview's 'Expected Online: September 2028' matches it but appears to be derived from the same queue data. No developer press release or news gives an independent date, and the project may be withdrawn, which would make any COD moot.
Developer: LBNL lists no developer, and none of the search results name a developer or parent for the CAISO-2267 Quark project. The other results are unrelated (astronomy filters, Quark Power Canada, etc.).
Status: interconnection.fyi, in both its project page and its CAISO market listing, shows Quark (2267) as Withdrawn. Cleanview still lists it as planned for September 2028, which is probably lagging queue data. Both listings come from the same type of aggregator and no developer source confirms either state, so this is a tentative call.
About
Generated Oct 25, 2026
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
Quark (queue ID CAISO-2267) is a proposed hybrid solar and battery storage development project located in Fresno County, California. The project has a total capacity of 2,044.7 MW, consisting of an 869.4 MW solar photovoltaic component and a 1,175.3 MW battery energy storage component. It is planned to interconnect at the Harlan Switching Station 500 kV point of interconnection, within the service territory of Pacific Gas and Electric Company (PG&E). No developer is identified in the available data.
The project is listed as active in the interconnection queue administered by the California Independent System Operator (CAISO). It entered the queue on April 17, 2023, and is being evaluated as part of CAISO's Cluster 15 study process. The project has requested Network Resource Interconnection Service (NRIS) and has a proposed commercial operation date of September 30, 2028. As of the latest available data, work on its interconnection agreement had not started.
Summary provenance
Summary generated Oct 25, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- LBNL queue source as of: Dec 31, 2025.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
CA
County
Fresno
Grid Region
CAISO (California)
Market
ISO/RTO Member
Developer
—
Utility
PGAE
Entity
CAISO
Service Type
NRIS
Point of Interconnection
HARLAN SW STA 500 kV
Data Source
LBNL
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- CAISO
- Trading Hub
- TH_ZP26_GEN-APND
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Solar queue pipeline by status
Data tables and metrics from the InfraSure database.
Geothermal queue pipeline overview
Summary analysis with parallel narrative sections and visualizations.
Battery Storage queue pipeline by status
Data tables and metrics from the InfraSure database.
AEP Jacksonville Solar Project
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.