Jackrabbit Power Bank (CAISO-2263) — Project Summary

Queue ID
CAISO-2263
Capacity
307.62 MW
Technology
Battery
Status
active
Location
Santa Clara, CA
Region
CAISO
Developer
—
IA Status
Not Started

Jackrabbit Power Bank

CAISO-2263BetaActiveBatteryCAISOLBNL

307.62 MW storage in Santa Clara, CA · In queue since April 2023 · Proposed COD June 2029

BA: CISOISO/RTO: CAISONERC: WECCRC: RCW

307.62 MW

Capacity

1

Components

Battery

3y 7m

In Queue

Not Started

IA Phase

COD target: 2029

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

6y 2m

Study Phase

Cluster 15

In Study38%
Queue EntryApr 17, 2023

Interconnection request submitted to ISO/RTO

Cluster Study (Phase I/II)Current

CAISO uses cluster studies where projects are batched annually and studied together.

Typical: 36–48 months (IR to IA)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2029-06-01

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Jun 1, 2029
From queue filing
Developer in saved assessment
—
Status at research time
Active
Active in CAISO queue (Cluster 15, POI at Los Esteros 115 kV); IA not started; no public sign of construction or permitting.
Financing
Not recorded
Research sources and reasoning (5 recorded sources)

low confidence at research time

  1. interconnection.fyi/project/caiso-54785
  2. interxdata.com/projects/jackrabbit-power-bank-caiso-2263/
  3. cleanview.co/power-projects/planned/battery-storage-projects/california/54785_storage/jackrabbit-power-bank
  4. app.nrgmap.com/queues/caiso-2263
  5. caiso.com/Documents/Cluster-15-Interconnection-Requests.xlsx

Commercial operation date: Only the LBNL proposed COD of 2029-06-01 exists. Aggregator pages (interconnection.fyi, Cleanview) repeat the same date, but they derive from the queue data and are not independent. No developer press release or news item gives a different target.

Developer: LBNL developer field is null, and no search result names a developer or parent company. The aggregator pages show no developer name either.

Status: LBNL and several aggregators (interconnection.fyi, interXdata, NRG Map) list the project as active. No source reports construction, withdrawal or suspension.

About

Saved background

Generated Oct 25, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Jackrabbit Power Bank is a proposed battery energy storage project in Santa Clara County, California, with a total capacity of 307.62 MW. The development project consists of a single battery storage component. No developer is identified in the available data. It is planned to connect to the grid at the Los Esteros 115 kV point of interconnection within the service territory of Pacific Gas and Electric Company (PG&E).

The project is listed in the California Independent System Operator (CAISO) interconnection queue under queue ID CAISO-2263 and holds active status. It entered the queue on April 17, 2023, and is being evaluated as part of CAISO's Cluster 15 study process. The project has requested Network Resource Interconnection Service (NRIS). Its proposed commercial operation date is June 1, 2029. As of the latest available data, work on an interconnection agreement has not started.

Summary provenance

Summary generated Oct 25, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • LBNL queue source as of: Dec 31, 2025.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

CA

County

Santa Clara

Grid Region

CAISO (California)

Market

ISO/RTO Member

Developer

—

Utility

PGAE

Entity

CAISO

Service Type

NRIS

Point of Interconnection

LOS ESTEROS 115 kV

Data Source

LBNL

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
CAISO
Trading Hub
TH_ZP26_GEN-APND
Hub Confidence
MEDIUM
Nearest Node (Estimated)
LECEFGT2_7_B1
POI Substation
Los Esteros Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.