Bristlecone
921.09 MW hybrid in Nye, NV · In queue since April 2023 · Proposed COD June 2030
921.09 MW
Capacity
2
Components
Solar + Battery
3y 7m
In Queue
Not Started
IA Phase
COD target: 2030
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
7y 2m
Study Phase
Cluster 15
Interconnection request submitted to ISO/RTO
CAISO uses cluster studies where projects are batched annually and studied together.
Typical: 36–48 months (IR to IA)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2030-06-01
Cross-source intelligence
Experimental assessment saved at the research date. See the queue record for reported project facts.
Research sources and reasoning (5 recorded sources)
low confidence at research time
- cleanview.co/power-projects/planned/battery-storage-projects/nevada/54523_storage/bristlecone
- cleanview.co/power-projects/planned/solar-farms/nevada/54523_photovoltaic/bristlecone
- pucweb1.state.nv.us/PUC2/Dktinfo.aspx?Util=Renewable
- interconnection.fyi/projects/market/CAISO
- gridvisionai.com/retrospectives/caiso-valley-switch-230-kv
Commercial operation date: LBNL lists a proposed COD of 2030-06-01. Cleanview says the project is 'expected to come online in June 2030', but it is an aggregator that likely repeats the queue data, so it is not an independent confirmation. No developer press release or news item gives a financing-backed date.
Developer: The LBNL developer field is null and no search result names a developer or parent. A PUCN docket mentions a 'Bristlecone Solar Ranch Project' (about 450 MW PV plus up to 450 MW BESS), but the excerpt does not identify the applicant. The BLM 'Bristlecone Field Office' hits refer to a BLM office, not this project.
Status: LBNL shows 'active' and the IA status is 'Not Started'. Interconnection.fyi and the GridVision queue history both show it still in the queue. No search result shows construction, withdrawal or an executed IA.
About
Generated Oct 25, 2026
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
Bristlecone is a proposed hybrid solar and battery storage development project located in Nye County, Nevada. The project has a total capacity of 921.09 MW, consisting of a 460.95 MW solar photovoltaic component paired with a 460.14 MW battery energy storage component. The proposed point of interconnection is the Valley Switch 230 kV substation, within the service territory of GLW (GridLiance West). No developer has been publicly identified in the queue data.
The project is listed in the California Independent System Operator (CAISO) interconnection queue under the identifier CAISO-2257, with a queue entry date of April 17, 2023. It is being studied as part of CAISO's Cluster 15 study phase and has requested Energy Resource Interconnection Service (ERIS). As of the latest available data, the project's queue status is active, and its interconnection agreement process has not yet started. The proposed commercial operation date is June 1, 2030.
Summary provenance
Summary generated Oct 25, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- LBNL queue source as of: Dec 31, 2025.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
NV
County
Nye
Grid Region
CAISO (California)
Market
ISO/RTO Member
Developer
—
Utility
GLW
Entity
CAISO
Service Type
ERIS
Point of Interconnection
VALLEY SWITCH 230 kV
Data Source
LBNL
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- CAISO
- Trading Hub
- TH_NP15_GEN-APND
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Solar queue pipeline by status
Data tables and metrics from the InfraSure database.
Geothermal queue pipeline overview
Summary analysis with parallel narrative sections and visualizations.
Battery Storage queue pipeline by status
Data tables and metrics from the InfraSure database.
AEP Jacksonville Solar Project
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.