Solstice D
408.04 MW hybrid in Fresno, CA · In queue since April 2023 · Proposed COD May 2031
408.04 MW
Capacity
2
Components
Solar + Battery
3y 7m
In Queue
Not Started
IA Phase
COD target: 2031
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
8y 1m
Study Phase
Cluster 15
Interconnection request submitted to ISO/RTO
CAISO uses cluster studies where projects are batched annually and studied together.
Typical: 36–48 months (IR to IA)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2031-05-01
Cross-source intelligence
Experimental assessment saved at the research date. See the queue record for reported project facts.
Research sources and reasoning (4 recorded sources)
low confidence at research time
- interconnection.fyi/project/caiso-54849
- interxdata.com/projects/solstice-d-caiso-2251/
- cleanview.co/power-projects/planned/solar-farms/california/54849_storage/solstice-d
- grokipedia.com/page/Solstice_Solar_Project_Fresno_County
Commercial operation date: The LBNL proposed COD is 2031-05-01. The interconnection.fyi and Cleanview aggregators show April 30, 2031 and 'Expected online 2031', but they appear to mirror the CAISO queue data rather than give independent developer-backed targets. No press release or news item gives a different date.
Developer: The LBNL developer field is null and no source names a developer for Solstice D. Grokipedia says the sibling Solstice projects have no publicly disclosed owner. The CEC result about IP Darden I / Intersect Power covers the separate Darden project, so it should not be attributed to Solstice D.
Status: LBNL lists the project as active and aggregators (interconnection.fyi, interxdata, Cleanview) agree. Grokipedia says the sibling Solstice projects remain in the study process with no permitting or construction milestones.
About
Generated Oct 25, 2026
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
Solstice D is a proposed hybrid solar and battery storage development project in Fresno County, California, with a total capacity of 408.04 MW. It combines a 204.41 MW solar photovoltaic component with a 203.63 MW battery energy storage component. The project is in the service territory of Pacific Gas and Electric Company (PG&E) and would connect to the grid at the Manning 500 kV point of interconnection.
The project is listed as active in the interconnection queue of the California Independent System Operator (CAISO) under queue ID CAISO-2251. It entered the queue on April 17, 2023, and is being evaluated as part of CAISO's Cluster 15 study process. The project has requested Network Resource Interconnection Service (NRIS). Its interconnection agreement status is listed as "Not Started," and its proposed commercial operation date is May 1, 2031.
Summary provenance
Summary generated Oct 25, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- LBNL queue source as of: Dec 31, 2025.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
CA
County
Fresno
Grid Region
CAISO (California)
Market
ISO/RTO Member
Developer
—
Utility
PG&E
Entity
CAISO
Service Type
NRIS
Point of Interconnection
MANNING 500 kV
Data Source
LBNL
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- CAISO
- Trading Hub
- TH_ZP26_GEN-APND
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Solar queue pipeline by status
Data tables and metrics from the InfraSure database.
AEP Jacksonville Solar Project
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
can you provide me with the capacity factor for allrenewable facilities in 2024
Data tables and metrics from the InfraSure database.
Top 10 solar states
Data tables and metrics from the InfraSure database.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.