Shoestring
269.53 MW hybrid in Fresno, CA · In queue since April 2023 · Proposed COD May 2031
269.53 MW
Capacity
2
Components
Solar + Battery
3y 7m
In Queue
Not Started
IA Phase
COD target: 2031
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
8y 1m
Study Phase
Cluster 15
Interconnection request submitted to ISO/RTO
CAISO uses cluster studies where projects are batched annually and studied together.
Typical: 36–48 months (IR to IA)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2031-05-01
Cross-source intelligence
Experimental assessment saved at the research date. See the queue record for reported project facts.
Milestones in this assessment
Target COD of May 2031 per CAISO queue filing
cleanview.coResearch sources and reasoning (6 recorded sources)
low confidence at research time
- cleanview.co/power-projects/planned/solar-farms/california/54665_photovoltaic/shoestring
- cpuc.ca.gov/-/media/cpuc-website/divisions/energy-division/documents/integrated-resource-plan-and-long-term-procurement-plan-irp-ltpp/2024-2026-irp-cycle-events-and-materials/assumptions-for-the-2025-2026-tpp/mappingcifrom_cluster15_apps_09-25-24.xlsx
- caiso.com/documents/cluster-15-interconnection-requests.xlsx
- infrasure.ai/project/caiso-54665-shoestring
- eta-publications.lbl.gov/sites/default/files/2024-09/hybrid_plant_tracking_2024_data_workbook.xlsx
- sonomacleanpower.org/uploads/documents/Appendix-A-Offer-Form.xlsx
Commercial operation date: LBNL queue filing shows 2031-05-01 COD. Multiple independent sources (Cleanview, LBNL hybrid tracking workbook) confirm 2031 target with no contradictory evidence from press releases or financing announcements.
Developer: No developer identified in LBNL filing. Search results include only technical databases (Cleanview, InfraSure, renewablesinfo.org) that aggregate queue data but provide no developer attribution. No press releases, corporate announcements, or ownership signals found.
Status: LBNL shows 'active' status with IA 'Not Started'. CAISO Cluster 15 documentation and Sonoma Clean Power reference confirm project is in cluster study phase with no advanced permitting or construction activity.
About
Generated Oct 25, 2026
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
Shoestring is a proposed hybrid solar and battery storage development project located in Fresno County, California. The project has a total capacity of 269.53 MW, consisting of a 135.17 MW solar photovoltaic component and a 134.36 MW battery energy storage component. It is listed in the interconnection queue of the California Independent System Operator (CAISO) under queue ID CAISO-2249, within the service territory of Pacific Gas and Electric Company (PG&E). No developer is identified in the available queue data.
The project entered the CAISO queue on April 17, 2023, and is being evaluated as part of the Cluster 15 study phase. It has requested Network Resource Interconnection Service (NRIS) and proposes to connect to the grid at the Manning 500 kV point of interconnection. As of the latest data, the project's queue status is active, and work on its interconnection agreement has not yet started. The proposed commercial operation date is May 1, 2031.
Summary provenance
Summary generated Oct 25, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- LBNL queue source as of: Dec 31, 2025.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
CA
County
Fresno
Grid Region
CAISO (California)
Market
ISO/RTO Member
Developer
—
Utility
PG&E
Entity
CAISO
Service Type
NRIS
Point of Interconnection
MANNING 500 kV
Data Source
LBNL
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- CAISO
- Trading Hub
- TH_ZP26_GEN-APND
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
can you provide me with the capacity factor for allrenewable facilities in 2024
Data tables and metrics from the InfraSure database.
can you provide me with the capacity factor for allrenewable facilities in 2024
Data tables and metrics from the InfraSure database.
Shoestring
Data-driven briefing on Shoestring — fleet, generation, financial, and news signals.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.