Sunflower
1,430.2 MW hybrid in San Bernardino, CA · In queue since April 2023 · Proposed COD March 2031
1,430.2 MW
Capacity
2
Components
Solar + Battery
3y 7m
In Queue
Not Started
IA Phase
COD target: 2031
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
7y 11m
Study Phase
Cluster 15
Interconnection request submitted to ISO/RTO
CAISO uses cluster studies where projects are batched annually and studied together.
Typical: 36–48 months (IR to IA)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2031-03-01
Cross-source intelligence
Experimental assessment saved at the research date. See the queue record for reported project facts.
Research sources and reasoning (1 recorded sources)
low confidence at research time
Commercial operation date: The only COD signal is the LBNL proposed_cod of 2031-03-01. A Cleanview listing says the project is 'Expected online 2031', but it is likely derived from the queue data rather than an independent developer-backed target, so I did not treat it as a second confirmation.
Developer: The LBNL developer field is null and no search result names a developer for the CAISO-2240 Sunflower project in San Bernardino County. The Entergy and Recurrent results are for a 100 MW Mississippi project, and the RWE 'Sunflower Projects' page could not be tied to this queue entry, so none of them were used.
Status: The LBNL status is 'active' and nothing in the search results contradicts it. The Cleanview listing describes the project as 'planned', which is consistent with that.
About
Generated Oct 25, 2026
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
Sunflower is a proposed hybrid solar and battery storage development project in San Bernardino County, California. The project has a total capacity of 1,430.2 MW, divided equally between two components: 715.1 MW of solar generation and 715.1 MW of battery storage. No developer is identified in the available interconnection data. The project would interconnect within the service territory of Southern California Edison (SCE) at the Lugo-Pisgah No. 2 point of interconnection.
The project is listed in the California Independent System Operator (CAISO) interconnection queue under queue ID CAISO-2240. It entered the queue on April 17, 2023, and its status is active. It is being studied as part of CAISO's Cluster 15 and has requested Energy Resource Interconnection Service (ERIS). As of the latest available data, the interconnection agreement process has not started. The proposed commercial operation date is March 1, 2031.
Summary provenance
Summary generated Oct 25, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- LBNL queue source as of: Dec 31, 2025.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
CA
County
San Bernardino
Grid Region
CAISO (California)
Market
ISO/RTO Member
Developer
—
Utility
SCE
Entity
CAISO
Service Type
ERIS
Point of Interconnection
LUGO-PISGAH NO.2
Data Source
LBNL
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- CAISO
- Trading Hub
- TH_SP15_GEN-APND
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Solar queue pipeline by status
Data tables and metrics from the InfraSure database.
Geothermal queue pipeline overview
Summary analysis with parallel narrative sections and visualizations.
Battery Storage queue pipeline by status
Data tables and metrics from the InfraSure database.
Sunflower Electric Power growth signals — PPAs, construction, new projects
Data-driven briefing on Sunflower — fleet, generation, financial, and news signals.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.