Ripple (CAISO-2234) — Project Summary

Queue ID
CAISO-2234
Capacity
1879.7944 MW
Technology
Solar+Battery
Status
active
Location
Kings, CA
Region
CAISO
Developer
—
IA Status
Not Started

Ripple

CAISO-2234BetaActiveSolarBatteryCAISOLBNL

1,879.794 MW hybrid in Kings, CA · In queue since April 2023 · Proposed COD October 2031

BA: CISOISO/RTO: CAISONERC: WECCRC: RCW

1,879.794 MW

Capacity

2

Components

Solar + Battery

3y 7m

In Queue

Not Started

IA Phase

COD target: 2031

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

8y 6m

Study Phase

Cluster 15

In Study38%
Queue EntryApr 17, 2023

Interconnection request submitted to ISO/RTO

Cluster Study (Phase I/II)Current

CAISO uses cluster studies where projects are batched annually and studied together.

Typical: 36–48 months (IR to IA)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2031-10-03

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Oct 3, 2031
From queue filing
Developer in saved assessment
—
Status at research time
Active
Active in the CAISO queue (2234, queued 2023-04-17); interconnection agreement not started; no public construction or permitting news found.
Financing
Not recorded

Milestones in this assessment

COD targetOct 2031Latest in this assessment

Cleanview lists the planned Ripple solar farm (Kings and Fresno, CA) as expected online October 2031, consistent with the LBNL queue date.

cleanview.co
Research sources and reasoning (2 recorded sources)

low confidence at research time

  1. cleanview.co/power-projects/planned/solar-farms/california/54684_photovoltaic/ripple
  2. interconnection.fyi/project/caiso-54684

Commercial operation date: Only the LBNL filing gives a firm date (2031-10-03). Cleanview's aggregator listing ("expected to come online in October 2031") matches it but appears to derive from the same queue data, so it is not an independent post-LBNL signal. No developer press release or news article supports a different date.

Developer: The LBNL developer field is null, and none of the search results name a developer for the Ripple project in Kings County. The relevant results are queue aggregators, and the rest are unrelated articles that match the word 'ripple'.

Status: LBNL lists the project as active with IA status 'Not Started'. Aggregators (interconnection.fyi, Cleanview) also show it as active/planned, and nothing suggests withdrawal or construction.

About

Saved background

Generated Oct 25, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Ripple is a proposed hybrid solar and battery storage development project located in Kings County, California. The project has a total capacity of 1,879.79 MW, comprising a 945.92 MW solar photovoltaic component and a 933.87 MW battery energy storage component. It is planned to interconnect at the Dry Lake Switching Station 500 kV point of interconnection, within the service territory of Pacific Gas and Electric Company (PG&E).

The project is listed in the California Independent System Operator (CAISO) interconnection queue under queue ID CAISO-2234, which it entered on April 17, 2023. It is being studied as part of CAISO's Cluster 15 and has requested Energy Resource Interconnection Service (ERIS). As of the latest available data, the project's queue status is active, and work on its interconnection agreement has not started. The proposed commercial operation date is October 3, 2031.

Summary provenance

Summary generated Oct 25, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • LBNL queue source as of: Dec 31, 2025.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

CA

County

Kings

Grid Region

CAISO (California)

Market

ISO/RTO Member

Developer

—

Utility

PGAE

Entity

CAISO

Service Type

ERIS

Point of Interconnection

DRY LAKE SW STA 500 kV

Data Source

LBNL

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Technology
Solar945.923 MW · 50%
Battery933.872 MW · 50%
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
CAISO
Trading Hub
TH_ZP26_GEN-APND
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.