Conduit Energy Storage 2
199 MW storage in San Bernardino, CA · In queue since April 2023 · Proposed COD February 2031
199 MW
Capacity
1
Components
Battery
3y 7m
In Queue
Not Started
IA Phase
COD target: 2031
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
7y 10m
Study Phase
Cluster 15
Interconnection request submitted to ISO/RTO
CAISO uses cluster studies where projects are batched annually and studied together.
Typical: 36–48 months (IR to IA)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2031-02-26
Cross-source intelligence
Experimental assessment saved at the research date. See the queue record for reported project facts.
Milestones in this assessment
Entered CAISO Cluster 15 interconnection queue as 199 MW battery storage project
caiso.comResearch sources and reasoning (3 recorded sources)
low confidence at research time
- cleanview.co/power-projects/planned/battery-storage-projects/california/54896_storage/conduit-energy-storage-2
- caiso.com/documents/cluster-15-interconnection-requests.xlsx
- cpuc.ca.gov/-/media/cpuc-website/divisions/energy-division/documents/integrated-resource-plan-and-long-term-procurement-plan-irp-ltpp/2024-2026-irp-cycle-events-and-materials/assumptions-for-the-2025-2026-tpp/mappingcifrom_cluster15_apps_09-25-24.xlsx
Commercial operation date: Only LBNL queue data provides a COD target of 2031-02-26. No news articles, press releases, or developer announcements found to validate or update this date. Cleanview aggregator confirms 2031 expected online date, but this appears derivative of LBNL data.
Developer: LBNL snapshot lists developer as null. No press releases, corporate announcements, or news coverage identify the project sponsor or operating company. CAISO Cluster 15 spreadsheet and CPUC filings list the project name but omit developer information.
Status: LBNL reports 'active' status with IA 'Not Started'. No news coverage suggests project advancement beyond queue position. Appears to be in standard interconnection study phase with 2031 target.
About
Generated Oct 25, 2026
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
Conduit Energy Storage 2 is a proposed battery energy storage development project located in San Bernardino County, California. The project has a total planned capacity of 199 MW, consisting entirely of battery storage. It is listed under queue ID CAISO-2227 in the interconnection queue of the California Independent System Operator (CAISO), within the service territory of Southern California Edison (SCE). The project's developer is not identified in the available data.
The project entered the CAISO interconnection queue on April 17, 2023, and is being studied as part of Cluster 15. It has requested Network Resource Interconnection Service (NRIS) and proposes to connect to the grid at the Lugo 500 kV point of interconnection. As of the latest data, the project's queue status is active, though work on its interconnection agreement has not yet started. The proposed commercial operation date is February 26, 2031.
Summary provenance
Summary generated Oct 25, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- LBNL queue source as of: Dec 31, 2025.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
CA
County
San Bernardino
Grid Region
CAISO (California)
Market
ISO/RTO Member
Developer
—
Utility
SCE
Entity
CAISO
Service Type
NRIS
Point of Interconnection
LUGO 500 kV
Data Source
LBNL
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- CAISO
- Trading Hub
- TH_SP15_GEN-APND
- Hub Confidence
- MEDIUM
- POI Substation
- Lugo Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.