Energia Sierra Juarez 4
309.1 MW generation in Tijuana, MX · In queue since April 2023 · Proposed COD March 2030
309.1 MW
Capacity
1
Components
Wind
3y 7m
In Queue
Not Started
IA Phase
COD target: 2030
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
6y 11m
Study Phase
Cluster 15
Interconnection request submitted to ISO/RTO
CAISO uses cluster studies where projects are batched annually and studied together.
Typical: 36–48 months (IR to IA)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2030-03-31
Cross-source intelligence
Experimental assessment saved at the research date. See the queue record for reported project facts.
Research sources and reasoning (4 recorded sources)
low confidence at research time
- interconnection.fyi/project/caiso-54674
- interxdata.com/projects/energia-sierra-juarez-4-caiso-2224/
- sempra.com/newsroom/press-releases/energia-sierra-juarez-phase-ii-wind-farm-commences-operations
- energiasj.com/?l=en
Commercial operation date: Only LBNL (proposed COD 2030-03-31) and queue aggregator mirrors (interconnection.fyi lists March 30, 2030) give a date for ESJ 4. No developer press release or news item gives a newer target for this phase.
Developer: LBNL developer field is null. The ESJ 4 queue entry shares a name with the operating Energía Sierra Juárez wind farm (Sempra subsidiary, formerly IEnova), but no source explicitly ties the CAISO-2224 filing to Sempra. The developer is therefore inferred from the name and left as low-confidence.
Status: LBNL and the aggregators (interconnection.fyi, interxdata) all show 'active'. No source indicates withdrawal or construction for ESJ 4.
About
Generated Oct 25, 2026
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
Energia Sierra Juarez 4 is a proposed 309.1 MW wind generation project located in the Tijuana area of Mexico ("MX" in the source data). Although sited outside the United States, the development project is seeking interconnection to the US grid through the California Independent System Operator (CAISO). It would connect within the San Diego Gas & Electric (SDGE) utility territory at the East County 230 kV point of interconnection. The project consists of a single wind component with the full 309.1 MW of capacity and has requested Energy Resource Interconnection Service (ERIS).
The project entered the CAISO interconnection queue on April 17, 2023, under queue ID CAISO-2224, and is being evaluated as part of Cluster 15. Its queue status is listed as active, and it has a proposed commercial operation date of March 31, 2030. As of the latest available data, the interconnection agreement (IA) process has not yet started. No developer is identified in the queue record.
Summary provenance
Summary generated Oct 25, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- LBNL queue source as of: Dec 31, 2025.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
MX
County
Tijuana
Grid Region
CAISO (California)
Market
ISO/RTO Member
Developer
—
Utility
SDGE
Entity
CAISO
Service Type
ERIS
Point of Interconnection
EAST COUNTY 230 kV
Data Source
LBNL
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- CAISO
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Max 4 Wind
Data tables and metrics from the InfraSure database.
FPL Energy Oliver Wind II LLC
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Wind queue pipeline overview
Summary analysis with parallel narrative sections and visualizations.
FPL Energy Oliver Wind I LLC
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.