Emerita Energy Storage
205.7 MW storage in Alameda, CA · In queue since April 2023 · Proposed COD March 2028
205.7 MW
Capacity
1
Components
Battery
3y 7m
In Queue
Not Started
IA Phase
COD target: 2028
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
4y 11m
Study Phase
Cluster 15
Interconnection request submitted to ISO/RTO
CAISO uses cluster studies where projects are batched annually and studied together.
Typical: 36–48 months (IR to IA)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-03-01
Cross-source intelligence
Experimental assessment saved at the research date. See the queue record for reported project facts.
Milestones in this assessment
Requested COD of March 2028 in CAISO Cluster 15 interconnection queue
caiso.comResearch sources and reasoning (2 recorded sources)
low confidence at research time
- cleanview.co/power-projects/planned/battery-storage-projects/california/54840_storage/emerita-energy-storage
- caiso.com/documents/cluster-15-interconnection-requests.xlsx
Commercial operation date: LBNL queue snapshot shows proposed COD of March 2028, confirmed by Cleanview aggregator listing the same March 2028 target. No contradictory sources found.
Developer: LBNL filing shows null developer field. No press releases, corporate announcements, or news coverage found identifying the project sponsor or operating company.
Status: LBNL shows 'active' status with 'Not Started' IA status. CAISO Cluster 15 spreadsheet confirms project remains in queue as of December 2024.
About
Generated Oct 25, 2026
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
Emerita Energy Storage is a proposed battery energy storage development project located in Alameda County, California. The project has a total planned capacity of 205.7 MW, consisting entirely of battery storage. It is situated within the service territory of Pacific Gas and Electric Company (PG&E) and is planned to connect to the grid at the Tesla 230 kV point of interconnection.
The project is listed in the California Independent System Operator (CAISO) interconnection queue under the identifier CAISO-2221, with a queue entry date of April 17, 2023. It is being evaluated as part of CAISO's Cluster 15 study process and has requested Network Resource Interconnection Service (NRIS). As of the most recent data, the project's queue status is active, and its interconnection agreement has not yet been started. The proposed commercial operation date is March 1, 2028.
Summary provenance
Summary generated Oct 25, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- LBNL queue source as of: Dec 31, 2025.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
CA
County
Alameda
Grid Region
CAISO (California)
Market
ISO/RTO Member
Developer
—
Utility
PGAE
Entity
CAISO
Service Type
NRIS
Point of Interconnection
TESLA 230 kV
Data Source
LBNL
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- CAISO
- Trading Hub
- TH_NP15_GEN-APND
- Hub Confidence
- MEDIUM
- Nearest Node (Estimated)
- TESLA_1_B1
- POI Substation
- Tesla Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.