Hacienda (CAISO-2220) — Project Summary

Queue ID
CAISO-2220
Capacity
156.525 MW
Technology
Solar
Status
active
Location
San Bernardino, CA
Region
CAISO
Developer
—
IA Status
Not Started

Hacienda

CAISO-2220BetaActiveSolarCAISOLBNL

156.525 MW generation in San Bernardino, CA · In queue since April 2023 · Proposed COD December 2030

BA: CISOISO/RTO: CAISONERC: WECCRC: RCW

156.525 MW

Capacity

1

Components

Solar

3y 7m

In Queue

Not Started

IA Phase

COD target: 2030

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

7y 8m

Study Phase

Cluster 15

In Study38%
Queue EntryApr 17, 2023

Interconnection request submitted to ISO/RTO

Cluster Study (Phase I/II)Current

CAISO uses cluster studies where projects are batched annually and studied together.

Typical: 36–48 months (IR to IA)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2030-12-01

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
2030
From queue filing
Developer in saved assessment
—
Status at research time
Active
Active — no public announcements or construction activity identified; project appears to be in early interconnection study phase
Financing
Not recorded
Research sources and reasoning (0 recorded sources)

low confidence at research time

No source list recorded with this assessment.

Commercial operation date: Only LBNL queue data provides a COD target of December 2030. No news coverage or press releases found for this specific utility-scale solar project to validate or update this date.

Developer: LBNL snapshot lists developer as null. Search results returned only residential solar installers, housing developments, and unrelated 'Hacienda' place names—no utility-scale project announcements or developer press releases.

Status: LBNL status is 'active' with IA 'Not Started'. Zero search results matched this 156 MW utility-scale project, suggesting it has not yet been publicly announced by a developer or reached permitting milestones.

About

Saved background

Generated Oct 25, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Hacienda is a proposed solar generation project located in San Bernardino County, California. The development project has a total planned capacity of 156.53 megawatts (MW), consisting entirely of solar photovoltaic generation. No developer is identified in the available queue data. The project would interconnect to the grid at the Pisgah 230 kV substation within the service territory of Southern California Edison (SCE).

The project is listed in the California Independent System Operator (CAISO) interconnection queue under the identifier CAISO-2220. It entered the queue on April 17, 2023, and is being evaluated as part of CAISO's Cluster 15 study process. The project has requested Energy Resource Interconnection Service (ERIS) and remains in active status. As of the latest available data, its interconnection agreement process has not yet started. The proposed commercial operation date is December 1, 2030.

Summary provenance

Summary generated Oct 25, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • LBNL queue source as of: Dec 31, 2025.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

CA

County

San Bernardino

Grid Region

CAISO (California)

Market

ISO/RTO Member

Developer

—

Utility

SCE

Entity

CAISO

Service Type

ERIS

Point of Interconnection

PISGAH 230 kV

Data Source

LBNL

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
CAISO
Trading Hub
TH_SP15_GEN-APND
Hub Confidence
MEDIUM
POI Substation
Pisgah Switchyard

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.