Fornax (CAISO-2209) — Project Summary

Queue ID
CAISO-2209
Capacity
206.25 MW
Technology
Solar+Battery
Status
active
Location
Fresno, CA
Region
CAISO
Developer
—
IA Status
Not Started

Fornax

CAISO-2209BetaActiveSolarBatteryCAISOLBNL

206.25 MW hybrid in Fresno, CA · In queue since April 2023 · Proposed COD December 2031

BA: CISOISO/RTO: CAISONERC: WECCRC: RCW

206.25 MW

Capacity

2

Components

Solar + Battery

3y 7m

In Queue

Not Started

IA Phase

COD target: 2031

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

8y 8m

Study Phase

Cluster 15

In Study38%
Queue EntryApr 17, 2023

Interconnection request submitted to ISO/RTO

Cluster Study (Phase I/II)Current

CAISO uses cluster studies where projects are batched annually and studied together.

Typical: 36–48 months (IR to IA)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2031-12-01

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
2031
From queue filing
Developer in saved assessment
—
Status at research time
Active
Active — early-stage queue position in CAISO Cluster 15, no IA progress or permitting signals detected
Financing
Not recorded

Milestones in this assessment

IA executedApr 2023Latest in this assessment

Entered CAISO Cluster 15 interconnection queue

caiso.com
Research sources and reasoning (5 recorded sources)

low confidence at research time

  1. renewablesinfo.org/project/caiso-54643-fornax
  2. caiso.com/documents/cluster-15-interconnection-requests.xlsx
  3. cleanview.co/planned-solar-projects/CA/54643_photovoltaic/fornax
  4. cleanview.co/planned-battery-projects/CA/54643_storage/fornax
  5. cpuc.ca.gov/-/media/cpuc-website/divisions/energy-division/documents/integrated-resource-plan-and-long-term-procurement-plan-irp-ltpp/2024-2026-irp-cycle-events-and-materials/assumptions-for-the-2025-2026-tpp/mappingcifrom_cluster15_apps_09-25-24.xlsx

Commercial operation date: LBNL queue filing shows 2031-12-01 COD. Cleanview aggregator sites confirm 'November 2031' expected online date. No developer press releases or financing announcements found to provide updated timeline.

Developer: LBNL filing shows no developer. Search results include unrelated 'Fornax' entities (Samsung subsidiary in Indiana, UK heating company, Foresight Solar Fund). No credible link found between any operating solar developer and this CAISO Cluster 15 project.

Status: LBNL shows 'active' status with IA 'Not Started'. CAISO Cluster 15 spreadsheet confirms project in queue. No construction, permitting, or financing announcements found in search results.

About

Saved background

Generated Oct 25, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Fornax is a proposed solar-plus-battery hybrid development project located in Fresno County, California. The project has a total capacity of 206.25 MW, consisting of a 103.12 MW solar photovoltaic component paired with a 103.12 MW battery energy storage component. It is listed in the California Independent System Operator (CAISO) interconnection queue under queue ID CAISO-2209, within the service territory of Pacific Gas and Electric Company (PG&E). The developer of the project has not been publicly identified in the queue data.

The project entered the CAISO queue on April 17, 2023, and is being studied as part of Cluster 15. It remains in active status and has requested Energy Resource Interconnection Service (ERIS). The proposed point of interconnection is the Tranquillity Switching Station at 230 kV. As of the latest available data, the interconnection agreement process has not started, and the project's proposed commercial operation date is December 1, 2031.

Summary provenance

Summary generated Oct 25, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • LBNL queue source as of: Dec 31, 2025.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

CA

County

Fresno

Grid Region

CAISO (California)

Market

ISO/RTO Member

Developer

—

Utility

PGAE

Entity

CAISO

Service Type

ERIS

Point of Interconnection

TRANQUILLITY SW STA 230 kV

Data Source

LBNL

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Technology
Solar103.125 MW · 50%
Battery103.125 MW · 50%
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
CAISO
Trading Hub
TH_ZP26_GEN-APND
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.