Alisa Solar Energy Complex 2
1,000 MW hybrid in Yuma, AZ · In queue since April 2023 · Proposed COD June 2030
1,000 MW
Capacity
2
Components
Solar + Battery
3y 7m
In Queue
Not Started
IA Phase
COD target: 2030
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
7y 2m
Study Phase
Cluster 15
Interconnection request submitted to ISO/RTO
CAISO uses cluster studies where projects are batched annually and studied together.
Typical: 36–48 months (IR to IA)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2030-06-01
Cross-source intelligence
Experimental assessment saved at the research date. See the queue record for reported project facts.
Research sources and reasoning (5 recorded sources)
low confidence at research time
- interconnection.fyi/project/caiso-54516
- interxdata.com/projects/alisa-solar-energy-complex-2-caiso-2207/
- app.nrgmap.com/queues/caiso-2207
- infrasure.ai/ask/r/alisa-solar-energy-complex-2
- cleanview.co/power-projects/planned/battery-storage-projects/arizona/54516_storage/alisa-solar-energy-complex-2
Commercial operation date: LBNL lists a proposed COD of 2030-06-01. Cleanview's 'Expected online 2030' agrees on the year, but it is likely an aggregator repeat of the queue data rather than an independent developer-backed target. No press release or news source gives a different date.
Developer: LBNL developer field is null. The search results are queue aggregators and name no developer or parent. The 'Hoodini' label on Cleanview appears to be a list artifact, not a developer name.
Status: LBNL shows 'active', and aggregator pages (nrgmap status active as of 2026-09-29, interXdata, interconnection.fyi) agree. No evidence of withdrawal, IA execution, or construction.
About
Generated Oct 25, 2026
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
The Alisa Solar Energy Complex 2 is a proposed hybrid solar and battery storage development project in Yuma County, Arizona, with a total capacity of 1,000 megawatts (MW). The project combines a 500 MW solar photovoltaic component with a 500 MW battery energy storage component. Although it is located in Arizona, the project is seeking interconnection through the California Independent System Operator (CAISO), with San Diego Gas & Electric (SDG&E) as the associated utility. Its proposed point of interconnection is the North Gila – Hoodoo Wash line (SDG&E portion only).
The project entered the CAISO interconnection queue on April 17, 2023, under queue identifier CAISO-2207, and its status is active. It is being studied as part of CAISO's Cluster 15 study phase and has requested Energy Resource Interconnection Service (ERIS). The interconnection agreement process has not yet started. The project has a proposed commercial operation date of June 1, 2030.
Summary provenance
Summary generated Oct 25, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- LBNL queue source as of: Dec 31, 2025.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
AZ
County
Yuma
Grid Region
CAISO (California)
Market
ISO/RTO Member
Developer
—
Utility
SDGE
Entity
CAISO
Service Type
ERIS
Point of Interconnection
NORTH GILA - HOODOO WASH (SDGE Portion Only)
Data Source
LBNL
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- CAISO
- Trading Hub
- TH_SP15_GEN-APND
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Solar queue pipeline by status
Data tables and metrics from the InfraSure database.
Geothermal queue pipeline overview
Summary analysis with parallel narrative sections and visualizations.
Battery Storage queue pipeline by status
Data tables and metrics from the InfraSure database.
AEP Jacksonville Solar Project
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.