Bonita Bateria
102.91 MW storage in Orange, CA · In queue since April 2023 · Proposed COD May 2029
102.91 MW
Capacity
1
Components
Battery
3y 7m
In Queue
Not Started
IA Phase
COD target: 2029
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
6y 1m
Study Phase
Cluster 15
Interconnection request submitted to ISO/RTO
CAISO uses cluster studies where projects are batched annually and studied together.
Typical: 36–48 months (IR to IA)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2029-05-31
Cross-source intelligence
Experimental assessment saved at the research date. See the queue record for reported project facts.
Milestones in this assessment
Interconnection request submitted to CAISO Cluster 15
caiso.comResearch sources and reasoning (4 recorded sources)
low confidence at research time
- caiso.com/documents/cluster-15-interconnection-requests.xlsx
- cleanview.co/power-projects/planned/battery-storage-projects/california/54655_storage/bonita-bateria
- infrasure.ai/project/caiso-54655-bonita-bateria-2
- interconnection.fyi/project/caiso-54655
Commercial operation date: LBNL queue filing shows May 2029 COD. Multiple aggregator sites (Cleanview, InfraSure, interconnection.fyi) echo this date, but no independent developer press releases or news coverage exist to validate or update it.
Developer: LBNL filing lists no developer. Search results contain only aggregator database entries with no developer attribution. No press releases, corporate announcements, or ownership information found.
Status: LBNL status is 'active' with IA 'Not Started'. No construction, permitting, or financing announcements found in search results. Project appears to be in initial interconnection study phase.
About
Generated Oct 25, 2026
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
Bonita Bateria (queue ID CAISO-2206) is a proposed battery energy storage development project in Orange County, California. The standalone storage facility has a total capacity of 102.91 MW, consisting entirely of a single battery component. The project would interconnect at the Talega 138 kV point of interconnection within the San Diego Gas & Electric (SDG&E) utility service territory. It has requested Network Resource Interconnection Service (NRIS).
The project is in the interconnection queue of the California Independent System Operator (CAISO), which it entered on April 17, 2023. It is being evaluated as part of CAISO's Cluster 15 study process and remains in active status. As of the most recent queue data, work on its interconnection agreement had not started. The project's proposed commercial operation date is May 31, 2029.
Summary provenance
Summary generated Oct 25, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- LBNL queue source as of: Dec 31, 2025.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
CA
County
Orange
Grid Region
CAISO (California)
Market
ISO/RTO Member
Developer
—
Utility
SDGE
Entity
CAISO
Service Type
NRIS
Point of Interconnection
TALEGA 138 kV
Data Source
LBNL
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- CAISO
- Trading Hub
- TH_SP15_GEN-APND
- Hub Confidence
- MEDIUM
- Nearest Node (Estimated)
- PICO_1_N001
- POI Substation
- Talega Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No Ask reports yet for this entity.
Ask about Bonita BateriaForward forecasts, scenario decomposition, and risk-decision tooling for this queue project.