REMY
616.47 MW hybrid in Yuma, AZ · In queue since April 2021 · Proposed COD June 2029
616.47 MW
Capacity
2
Components
Solar + Battery
5y 7m
In Queue
System Impact Study
IA Phase
COD target: 2029
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
8y 2m
Study Phase
C14
Interconnection request submitted to ISO/RTO
Active sheet; C14
CAISO uses cluster studies where projects are batched annually and studied together.
Typical: 36–48 months (IR to IA)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2029-06-30
Cross-source intelligence
Experimental assessment saved at the research date. See the queue record for reported project facts.
Research sources and reasoning (3 recorded sources)
low confidence at research time
- caiso.com/documents/publicqueuereport.pdf
- interconnection.fyi/project/caiso-2154
- gridvisionai.com/retrospectives/caiso-hoodoo-wash
Commercial operation date: No news, press release, or developer source gives a COD for REMY. The only date is the LBNL proposed COD of 2029-06-30, so it is kept unverified.
Developer: The LBNL developer field is null. No search result links an operating company to CAISO-2154. Hits for 'Remy' were people's names, a Harvest Solar Facebook post about a person, and unrelated ERCOT and storage-facility items.
Status: The CAISO public queue report (Jun 2024) lists REMY 2154 as ACTIVE, which matches LBNL. The gridvisionai snippet shows 'Withdrawn 2023-01-13' next to a 408.5 MW battery row, which appears to be a different project. REMY's own row (2021-04-15, solar + battery) carries no withdrawal marker in the snippet.
About
Generated Apr 10, 2026 · Predates Oct 24, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
The REMY project is a proposed 616.47 MW hybrid solar and battery energy storage project located in Yuma County, Arizona. The development project consists of 308 MW of solar photovoltaic generation and 308.47 MW of battery energy storage. It is interconnected to the CAISO grid at the Hoodoo Wash Switchyard 500 kV.
The project, assigned queue ID CAISO-2154, entered the CAISO interconnection queue on April 15, 2021, with a proposed commercial operation date of June 30, 2029. The interconnecting utility is SDGE. As of the latest data, the project's interconnection status is in the System Impact Study phase. The project has appeared in recent news coverage.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- CAISO queue source as of: Oct 24, 2026.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
AZ
County
Yuma
Grid Region
CAISO (California)
Market
ISO/RTO Member
Developer
—
Utility
SDGE
Entity
CAISO
Service Type
NRIS
Point of Interconnection
Hoodoo Wash Switchyard 500 kV
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- CAISO
- Trading Hub
- TH_SP15_GEN-APND
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Solar queue pipeline by status
Data tables and metrics from the InfraSure database.
Geothermal queue pipeline overview
Summary analysis with parallel narrative sections and visualizations.
Battery Storage queue pipeline by status
Data tables and metrics from the InfraSure database.
AEP Jacksonville Solar Project
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.