KAWICH (CAISO-2147) — Project Summary

Queue ID
CAISO-2147
Capacity
700 MW
Technology
Solar+Battery
Status
active
Location
Clark, NV
Region
CAISO
Developer
—
IA Status
IA Executed

KAWICH

CAISO-2147BetaActiveSolarBatteryCAISOLBNL + Live

700 MW hybrid in Clark, NV · In queue since April 2021 · Proposed COD July 2029

BA: NEVPISO/RTO: CAISONERC: WECCRC: SPPW

700 MW

Capacity

2

Components

Solar + Battery

5y 7m

In Queue

IA Executed

IA Phase

Signed Dec 2024

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Queue → IA

3y 8m

IA → COD

4y 7m

Total Duration

3y 8m

Study Phase

C14

Construction75%
Queue EntryApr 15, 2021

Interconnection request submitted to ISO/RTO

Cluster Study (Phase I/II)

CAISO uses cluster studies where projects are batched annually and studied together.

Typical: 36–48 months (IR to IA)

Interconnection AgreementDec 18, 2024

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Active sheet; IA Executed; C14

Project under construction

Typical: 18–30 months

Commercial Operation

Proposed COD: 2029-07-27

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Jul 27, 2029
From queue filing
Developer in saved assessment
Clearway Energy
Status at research time
Active
Active in the CAISO queue with an IA executed 2024-12-18. Federal permitting is under way as a FAST-41 covered project: 350 MW PV plus up to 350 MW BESS on about 4,320 acres in Clark County, NV.
Financing
Not recorded
Research sources and reasoning (4 recorded sources)

low confidence at research time

  1. permitting.gov/projects/current-fast-41-portfolio
  2. permits.performance.gov/permitting-project/fast-41-covered-projects/kawich-solar-project
  3. cleanview.co/power-projects/planned/battery-storage-projects/nevada/2147_storage/kawich
  4. caiso.com/documents/list-of-large-generator-interconnection-agreements-and-small-generator-interconnection-agreements.pdf

Commercial operation date: Only the LBNL/CAISO queue date (2029-07-27) is available. Cleanview's 'Expected online 2029' is an aggregator listing that likely derives from the queue. No developer press release or financing-backed target was found to contradict it.

Developer: The LBNL developer field is null, so there is nothing to compare against. The FAST-41 portfolio at permitting.gov says 'Clearway Energy proposes to develop' the Kawich Solar Project. The CAISO LGIA list includes 'Kawich Renewables LLC', which may be the project entity, but the snippet doesn't link it to this queue entry, so I left the legal entity null.

Status: LBNL shows 'active' with an executed IA. The FAST-41 portfolio listing (updated Apr 2026) and the Performance.gov permitting dashboard show the project is still advancing through permitting, with no sign of withdrawal.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 24, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The KAWICH project is a proposed 700 MW hybrid solar and battery energy storage development in Clark County, Nevada. The project, located within the California Independent System Operator (CAISO) region, consists of a 350 MW solar photovoltaic array coupled with a 350 MW battery energy storage system. The interconnection customer is GLW.

KAWICH is listed in the CAISO interconnection queue as queue ID CAISO-2147, with an entry date of April 15, 2021. The project's proposed commercial operation date is July 27, 2029, and the Interconnection Agreement (IA) has been executed. The point of interconnection is the Innovation-Desert View 230 kV Line.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • CAISO queue source as of: Oct 24, 2026.
Development Risk

Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Financing close probability
EPC + tax-equity counterparty
Project Details

State

NV

County

Clark

Grid Region

CAISO (California)

Market

ISO/RTO Member

Developer

—

Utility

GLW

Entity

CAISO

Service Type

NRIS

Point of Interconnection

Innovation-Desert View 230 kV Line

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Technology
Solar350 MW · 50%
Battery350 MW · 50%
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
First-year output estimate
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year revenue projection
First-year DSCR
Financing close risk
Market Context
Approximate
ISO / RTO
CAISO
Trading Hub
TH_ZP26_GEN-APND
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.