KAWICH
700 MW hybrid in Clark, NV · In queue since April 2021 · Proposed COD July 2029
700 MW
Capacity
2
Components
Solar + Battery
5y 7m
In Queue
IA Executed
IA Phase
Signed Dec 2024
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Queue → IA
3y 8m
IA → COD
4y 7m
Total Duration
3y 8m
Study Phase
C14
Interconnection request submitted to ISO/RTO
CAISO uses cluster studies where projects are batched annually and studied together.
Typical: 36–48 months (IR to IA)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
Active sheet; IA Executed; C14
Project under construction
Typical: 18–30 months
Proposed COD: 2029-07-27
Cross-source intelligence
Experimental assessment saved at the research date. See the queue record for reported project facts.
Research sources and reasoning (4 recorded sources)
low confidence at research time
- permitting.gov/projects/current-fast-41-portfolio
- permits.performance.gov/permitting-project/fast-41-covered-projects/kawich-solar-project
- cleanview.co/power-projects/planned/battery-storage-projects/nevada/2147_storage/kawich
- caiso.com/documents/list-of-large-generator-interconnection-agreements-and-small-generator-interconnection-agreements.pdf
Commercial operation date: Only the LBNL/CAISO queue date (2029-07-27) is available. Cleanview's 'Expected online 2029' is an aggregator listing that likely derives from the queue. No developer press release or financing-backed target was found to contradict it.
Developer: The LBNL developer field is null, so there is nothing to compare against. The FAST-41 portfolio at permitting.gov says 'Clearway Energy proposes to develop' the Kawich Solar Project. The CAISO LGIA list includes 'Kawich Renewables LLC', which may be the project entity, but the snippet doesn't link it to this queue entry, so I left the legal entity null.
Status: LBNL shows 'active' with an executed IA. The FAST-41 portfolio listing (updated Apr 2026) and the Performance.gov permitting dashboard show the project is still advancing through permitting, with no sign of withdrawal.
About
Generated Apr 10, 2026 · Predates Oct 24, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
The KAWICH project is a proposed 700 MW hybrid solar and battery energy storage development in Clark County, Nevada. The project, located within the California Independent System Operator (CAISO) region, consists of a 350 MW solar photovoltaic array coupled with a 350 MW battery energy storage system. The interconnection customer is GLW.
KAWICH is listed in the CAISO interconnection queue as queue ID CAISO-2147, with an entry date of April 15, 2021. The project's proposed commercial operation date is July 27, 2029, and the Interconnection Agreement (IA) has been executed. The point of interconnection is the Innovation-Desert View 230 kV Line.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- CAISO queue source as of: Oct 24, 2026.
Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
NV
County
Clark
Grid Region
CAISO (California)
Market
ISO/RTO Member
Developer
—
Utility
GLW
Entity
CAISO
Service Type
NRIS
Point of Interconnection
Innovation-Desert View 230 kV Line
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- CAISO
- Trading Hub
- TH_ZP26_GEN-APND
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Solar queue pipeline by status
Data tables and metrics from the InfraSure database.
Geothermal queue pipeline overview
Summary analysis with parallel narrative sections and visualizations.
Battery Storage queue pipeline by status
Data tables and metrics from the InfraSure database.