STERLING
500 MW hybrid in Clark, NV · In queue since April 2021 · Proposed COD May 2031
500 MW
Capacity
2
Components
Solar + Battery
5y 7m
In Queue
System Impact Study
IA Phase
COD target: 2031
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
10y 1m
Study Phase
C14
Interconnection request submitted to ISO/RTO
Active sheet; C14
CAISO uses cluster studies where projects are batched annually and studied together.
Typical: 36–48 months (IR to IA)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2031-05-26
From dated articles. These observations may describe earlier stages or other project phases; see the queue record above for reported filing status.
Cross-source intelligence
Experimental assessment saved at the research date. See the queue record for reported project facts.
Research sources and reasoning (1 recorded sources)
low confidence at research time
Commercial operation date: Only the LBNL date (2031-05-26) is attributable to this Clark County, NV project, and Cleanview's 'Expected online 2031' likely just mirrors it. The ContourGlobal 'Project Sterling' coverage (509 MW, Mohave County, AZ, groundbreaking Oct. 7) is a different state and county, and the project isn't clearly in CAISO, so I did not use its timeline.
Developer: LBNL lists no developer. ContourGlobal (Arizona Project Sterling) and Sterling Solar, LLC (WAPA 225 MW interconnection) can't be tied to the Clark County, NV queue entry. The Google/NV Energy item is a geothermal partnership article that doesn't mention this project.
Status: The LBNL status 'active' with a System Impact Study and no IA date is consistent with the only project-specific listing found (Cleanview, 'planned'). No evidence contradicts it.
About
Generated Apr 10, 2026 · Predates Oct 24, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
The STERLING project is a proposed 500 MW hybrid solar and battery energy storage development in Clark County, Nevada. The project consists of a 250 MW solar photovoltaic array coupled with a 250 MW battery energy storage system. It is located within the California Independent System Operator (CAISO) region and is interconnected to the Southern California Edison (SCE) grid at the Mohave Substation 500 kV point of interconnection.
The project, identified as CAISO-2140 in the CAISO interconnection queue, entered the queue on April 15, 2021, and has a proposed commercial operation date of May 26, 2031. Its interconnection status is currently in the System Impact Study phase. The STERLING project has been mentioned in recent news coverage.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- CAISO queue source as of: Oct 24, 2026.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
NV
County
Clark
Grid Region
CAISO (California)
Market
ISO/RTO Member
Developer
—
Utility
SCE
Entity
CAISO
Service Type
NRIS
Point of Interconnection
Mohave Substation 500 kV
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- CAISO
- Trading Hub
- TH_SP15_GEN-APND
- Hub Confidence
- MEDIUM
- Nearest Node (Estimated)
- SOPOINT_LNODE-2
- POI Substation
- Mohave Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Last updated 2026-04-09
View all articlesSolar queue pipeline by status
Data tables and metrics from the InfraSure database.
Battery Storage queue pipeline by status
Data tables and metrics from the InfraSure database.
AEP Jacksonville Solar Project
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
can you provide me with the capacity factor for allrenewable facilities in 2024
Data tables and metrics from the InfraSure database.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.