HAVEN STORAGE (CAISO-2136) — Project Summary

Queue ID
CAISO-2136
Capacity
312.96 MW
Technology
Battery
Status
active
Location
Los Angeles, CA
Region
CAISO
Developer
—
IA Status
IA Executed

HAVEN STORAGE

CAISO-2136BetaActiveBatteryCAISOLBNL + Live

312.96 MW storage in Los Angeles, CA · In queue since April 2021 · Proposed COD February 2031

BA: CISOISO/RTO: CAISONERC: WECCRC: RCW

312.96 MW

Capacity

1

Components

Battery

5y 7m

In Queue

IA Executed

IA Phase

Signed Oct 2024

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Queue → IA

3y 6m

IA → COD

6y 4m

Total Duration

3y 6m

Study Phase

C14

Construction75%
Queue EntryApr 15, 2021

Interconnection request submitted to ISO/RTO

Cluster Study (Phase I/II)

CAISO uses cluster studies where projects are batched annually and studied together.

Typical: 36–48 months (IR to IA)

Interconnection AgreementOct 30, 2024

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Active sheet; IA Executed; C14

Project under construction

Typical: 6–18 months

Commercial Operation

Proposed COD: 2031-02-26

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Feb 26, 2031
From queue filing
Developer in saved assessment
—
Status at research time
Active
Active in the CAISO queue with an interconnection agreement executed 2024-10-30 (per LBNL). No public evidence of construction start or permitting.
Financing
Not recorded
Research sources and reasoning (3 recorded sources)

low confidence at research time

  1. interconnection.fyi/projects/market/CAISO
  2. energy-storage.news/swift-current-energy-closes-us242-million-financing-for-virginia-battery-storage-project/
  3. docs.cpuc.ca.gov/PublishedDocs/Efile/G000/M534/K048/534048570.PDF

Commercial operation date: Only the LBNL filing gives a COD (proposed 2031-02-26). No search result or news item gives a project-specific COD for Haven Storage, so there is nothing to compare it against.

Developer: The LBNL developer field is null. The news-extracted 'Swift Current Energy' comes from an article about a US$242M financing for a Virginia battery project, not a California project, and nothing links it to CAISO-2136 Haven Storage. I did not attribute it. The live search turned up no developer for Haven Storage.

Status: LBNL lists the project as active with an IA executed, and the interconnection.fyi CAISO listing shows HAVEN STORAGE (2136, Los Angeles County) as Active. No source contradicts this.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 24, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The HAVEN STORAGE project is a proposed 312.96 MW battery storage project located in Los Angeles County, California. The project is in the California Independent System Operator (CAISO) interconnection queue as entry CAISO-2136, with a queue entry date of April 15, 2021, and a proposed commercial operation date of February 26, 2031. The interconnection agreement (IA) for the project has been executed. The project is interconnected to Southern California Edison (SCE) at the Rio Hondo Substation 230 kV point of interconnection.

The HAVEN STORAGE project has been mentioned in recent news articles.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • CAISO queue source as of: Oct 24, 2026.
Development Risk

Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Financing close probability
EPC + tax-equity counterparty
Project Details

State

CA

County

Los Angeles

Grid Region

CAISO (California)

Market

ISO/RTO Member

Developer

—

Utility

SCE

Entity

CAISO

Service Type

NRIS

Point of Interconnection

Rio Hondo Substation 230 kV

Data Source

LBNL + Live

DeveloperSwift Current EnergyEnergy-Storage.News · 2025-09-04
TransactionProject financingEnergy-Storage.News · 2025-09-04
Deal value$242.0MEnergy-Storage.News · 2025-09-04
LenderTruist Securities, CIBC, KeyBank, NatixisEnergy-Storage.News · 2025-09-04
PPA term15 yearsEnergy-Storage.News · 2025-09-04
Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
First-year output estimate
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year revenue projection
First-year DSCR
Financing close risk
Market Context
Approximate
ISO / RTO
CAISO
Trading Hub
TH_SP15_GEN-APND
Hub Confidence
MEDIUM
Nearest Node (Estimated)
RIOHONDO_6_N004
POI Substation
Rio Hondo Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

Insights & Articles (1)Beta

Last updated 2026-03-26

View all articles
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.