DIRAC
403.4 MW storage in San Bernardino, CA · In queue since April 2021 · Proposed COD February 2031
403.4 MW
Capacity
1
Components
Battery
5y 7m
In Queue
In Progress (unknown study)
IA Phase
Signed Oct 2025
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Queue → IA
4y 6m
IA → COD
5y 4m
Total Duration
4y 6m
Study Phase
C14
Interconnection request submitted to ISO/RTO
CAISO uses cluster studies where projects are batched annually and studied together.
Typical: 36–48 months (IR to IA)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
Active sheet; IA Executed; C14
Project under construction
Typical: 6–18 months
Proposed COD: 2031-02-26
Cross-source intelligence
Experimental assessment saved at the research date. See the queue record for reported project facts.
Research sources and reasoning (6 recorded sources)
medium confidence at research time
- cityofchino.org/1797/Dirac-Battery-Energy-Storage-System-Proj
- dirac.aypa.com/
- championnewspapers.com/community_news/article_5977460e-bfe6-4dfe-971b-4eb730fde469.html
- championnewspapers.com/community_news/article_7681d57c-fbc2-4f51-8781-390178d45811.html
- dailybulletin.com/2026/07/16/chino-planning-commission-narrowly-rejects-large-battery-energy-storage-system-amid-regulatory-safety-concerns/
- cbsnews.com/losangeles/news/chino-battery-storage-facility-dirac-energy-resident-fight-la-verne-fire-concerns/
Commercial operation date: None of the search results or news facts give a COD or construction timeline. The LBNL proposed_cod of 2031-02-26 is the only date available, and the local permitting fight makes any earlier target unlikely.
Developer: The LBNL developer field is null. The City of Chino project page names the applicant as Dirac BESS LLC, and the Chino Valley Champion and Daily Bulletin describe Aypa Power as the developer behind the 400 MW Dirac project. Dirac BESS LLC is therefore the project LLC (not confirmed as the LBNL filing entity) and Aypa Power is the operating company.
Status: LBNL shows the project as active and not operational. The news snippets conflict on the Chino local land-use outcome (planning commission denial, then an appeal, then a CBS report of approval), and nothing indicates withdrawal or cancellation.
About
Generated Apr 10, 2026 · Predates Oct 24, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
The DIRAC project is a proposed 403.4 MW battery storage project located in San Bernardino County, California. The project is in the California Independent System Operator (CAISO) interconnection queue as entry CAISO-2114, with a queue entry date of April 15, 2021. The proposed commercial operation date is February 26, 2031. The interconnecting utility is Southern California Edison (SCE).
The project's interconnection status is currently in the System Impact Study phase. The point of interconnection (POI) is the Chino Substation at 230 kV. Recent news coverage has discussed the development project.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- CAISO queue source as of: Oct 24, 2026.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
CA
County
San Bernardino
Grid Region
CAISO (California)
Market
ISO/RTO Member
Developer
—
Utility
SCE
Entity
CAISO
Service Type
NRIS
Point of Interconnection
Chino Substation 230 kV
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- CAISO
- Trading Hub
- TH_SP15_GEN-APND
- Hub Confidence
- MEDIUM
- Nearest Node (Estimated)
- CHINO_6_N007
- POI Substation
- Chino Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Battery storage queue pipeline
Summary analysis with parallel narrative sections and visualizations.
Battery Storage queue pipeline overview
Summary analysis with parallel narrative sections and visualizations.
DIRAC in ISO New England queue pipeline — 1 projects by technology and status
Data-driven briefing on DIRAC — fleet, generation, financial, and news signals.
DIRAC queue pipeline — 1 projects by technology and status
Data-driven briefing on DIRAC — fleet, generation, financial, and news signals.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.