DIRAC (CAISO-2114) — Project Summary

Queue ID
CAISO-2114
Capacity
403.4 MW
Technology
Battery
Status
active
Location
San Bernardino, CA
Region
CAISO
Developer
—
IA Status
In Progress (unknown study)

DIRAC

CAISO-2114BetaActiveBatteryCAISOLBNL + Live

403.4 MW storage in San Bernardino, CA · In queue since April 2021 · Proposed COD February 2031

BA: CISOISO/RTO: CAISONERC: WECCRC: RCW

403.4 MW

Capacity

1

Components

Battery

5y 7m

In Queue

In Progress (unknown study)

IA Phase

Signed Oct 2025

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Queue → IA

4y 6m

IA → COD

5y 4m

Total Duration

4y 6m

Study Phase

C14

Construction38%
Queue EntryApr 15, 2021

Interconnection request submitted to ISO/RTO

Cluster Study (Phase I/II)

CAISO uses cluster studies where projects are batched annually and studied together.

Typical: 36–48 months (IR to IA)

Interconnection AgreementOct 2, 2025

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Active sheet; IA Executed; C14

Project under construction

Typical: 6–18 months

Commercial Operation

Proposed COD: 2031-02-26

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Feb 26, 2031
From queue filing
Developer in saved assessment
Aypa Power
Filed as Dirac BESS LLC
Status at research time
Active
Active in the queue (IA in progress). Locally contested: the Chino Planning Commission rejected the project 4-3 on July 15, 2026. Aypa appealed to the City Council in September, and CBS later described the project as 'city-approved', so the final local outcome is not clearly confirmed.
Financing
Not recorded
Research sources and reasoning (6 recorded sources)

medium confidence at research time

  1. cityofchino.org/1797/Dirac-Battery-Energy-Storage-System-Proj
  2. dirac.aypa.com/
  3. championnewspapers.com/community_news/article_5977460e-bfe6-4dfe-971b-4eb730fde469.html
  4. championnewspapers.com/community_news/article_7681d57c-fbc2-4f51-8781-390178d45811.html
  5. dailybulletin.com/2026/07/16/chino-planning-commission-narrowly-rejects-large-battery-energy-storage-system-amid-regulatory-safety-concerns/
  6. cbsnews.com/losangeles/news/chino-battery-storage-facility-dirac-energy-resident-fight-la-verne-fire-concerns/

Commercial operation date: None of the search results or news facts give a COD or construction timeline. The LBNL proposed_cod of 2031-02-26 is the only date available, and the local permitting fight makes any earlier target unlikely.

Developer: The LBNL developer field is null. The City of Chino project page names the applicant as Dirac BESS LLC, and the Chino Valley Champion and Daily Bulletin describe Aypa Power as the developer behind the 400 MW Dirac project. Dirac BESS LLC is therefore the project LLC (not confirmed as the LBNL filing entity) and Aypa Power is the operating company.

Status: LBNL shows the project as active and not operational. The news snippets conflict on the Chino local land-use outcome (planning commission denial, then an appeal, then a CBS report of approval), and nothing indicates withdrawal or cancellation.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 24, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The DIRAC project is a proposed 403.4 MW battery storage project located in San Bernardino County, California. The project is in the California Independent System Operator (CAISO) interconnection queue as entry CAISO-2114, with a queue entry date of April 15, 2021. The proposed commercial operation date is February 26, 2031. The interconnecting utility is Southern California Edison (SCE).

The project's interconnection status is currently in the System Impact Study phase. The point of interconnection (POI) is the Chino Substation at 230 kV. Recent news coverage has discussed the development project.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • CAISO queue source as of: Oct 24, 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

CA

County

San Bernardino

Grid Region

CAISO (California)

Market

ISO/RTO Member

Developer

—

Utility

SCE

Entity

CAISO

Service Type

NRIS

Point of Interconnection

Chino Substation 230 kV

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
CAISO
Trading Hub
TH_SP15_GEN-APND
Hub Confidence
MEDIUM
Nearest Node (Estimated)
CHINO_6_N007
POI Substation
Chino Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform