GABRIEL STORAGE (CAISO-2113) — Project Summary

Queue ID
CAISO-2113
Capacity
405.750886 MW
Technology
Battery
Status
active
Location
Los Angeles, CA
Region
CAISO
Developer
—
IA Status
IA Executed

GABRIEL STORAGE

CAISO-2113BetaActiveBatteryCAISOLBNL + Live

405.751 MW storage in Los Angeles, CA · In queue since April 2021 · Proposed COD May 2033

BA: CISOISO/RTO: CAISONERC: WECCRC: RCW

405.751 MW

Capacity

1

Components

Battery

5y 7m

In Queue

IA Executed

IA Phase

Signed Jun 2025

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Queue → IA

4y 2m

IA → COD

7y 11m

Total Duration

4y 2m

Study Phase

C14

Construction75%
Queue EntryApr 15, 2021

Interconnection request submitted to ISO/RTO

Cluster Study (Phase I/II)

CAISO uses cluster studies where projects are batched annually and studied together.

Typical: 36–48 months (IR to IA)

Interconnection AgreementJun 10, 2025

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Active sheet; IA Executed; C14

Project under construction

Typical: 6–18 months

Commercial Operation

Proposed COD: 2033-05-15

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. Research and queue COD differ; this comparison does not confirm either date. See the queue record for reported project facts.

Research COD
2027
Differs from queue: May 15, 2033
Developer in saved assessment
Aypa Power (Blackstone portfolio company)
Status at research time
IA Executed
Active in the CAISO queue with an IA executed 2025-06-10. Local permitting is under way at 13620 Live Oak Lane, Irwindale (400 MW BESS on 15.94 acres), and the project is tied to the Rio Hondo 230 kV substation.
Financing
Not recorded
Research sources and reasoning (5 recorded sources)

low confidence at research time

  1. cleanview.co/power-projects/planned/battery-storage-projects/california/69509_1/gabriel
  2. energy-storage.news/aypa-power-secures-california-ra-agreements-with-investor-owned-utility-totalling-2gwh/
  3. irwindaleca.gov/806/Gabriel-Battery-Energy-Storage-System-BE
  4. infrasure.ai/plant/69509-gabriel
  5. interxdata.com/projects/gabriel-storage-caiso-public-queue-2113/

Commercial operation date: Cleanview's project-level record (Gabriel, 400 MW, Los Angeles) says 'Expected online 2027'. The 2033 LBNL date looks like a queue placeholder, since the IA was executed in June 2025 and Aypa has signed RA agreements for the Gabriel project. Only one source gives 2027 and the link between records is inferred, so this is a low-confidence correction.

Developer: LBNL lists no developer. Energy-Storage.News shows Aypa Power's 'Gabriel Battery Storage project' presented to Peninsula Clean Energy, and InfraSure lists the 400 MW Gabriel plant under the project entity 'San Gabriel Project LLC'. That LLC is not the LBNL filing entity, so developer_legal_entity stays null.

Status: LBNL shows status 'active' with an executed IA (2025-06-10), and the Irwindale city project page confirms a live local entitlement process. No source indicates construction start, withdrawal or suspension.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 24, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The Gabriel Storage project is a proposed 405.75 MW battery energy storage system located in Los Angeles County, California. The project is in the California Independent System Operator (CAISO) interconnection queue as entry CAISO-2113, with a queue entry date of April 15, 2021. The proposed commercial operation date is May 15, 2033. The project's interconnection status is currently in the System Impact Study phase.

The project, which is interconnected with Southern California Edison (SCE), has been mentioned in recent news coverage.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • CAISO queue source as of: Oct 24, 2026.
Development Risk

Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Financing close probability
EPC + tax-equity counterparty
Project Details

State

CA

County

Los Angeles

Grid Region

CAISO (California)

Market

ISO/RTO Member

Developer

—

Utility

SCE

Entity

CAISO

Service Type

NRIS

Point of Interconnection

Rio Hondo Substation 230 kV

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
First-year output estimate
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year revenue projection
First-year DSCR
Financing close risk
Market Context
Approximate
ISO / RTO
CAISO
Trading Hub
TH_SP15_GEN-APND
Hub Confidence
HIGH
Nearest Node (Estimated)
RIOHONDO_6_N001

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.