FLEETWOOD
405.515 MW storage in Los Angeles, CA · In queue since April 2021 · Proposed COD April 2032
405.515 MW
Capacity
1
Components
Battery
5y 7m
In Queue
System Impact Study
IA Phase
COD target: 2032
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
11 years
Study Phase
C14
Interconnection request submitted to ISO/RTO
Active sheet; C14
CAISO uses cluster studies where projects are batched annually and studied together.
Typical: 36–48 months (IR to IA)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2032-04-28
Cross-source intelligence
Experimental assessment saved at the research date. See the queue record for reported project facts.
Research sources and reasoning (3 recorded sources)
low confidence at research time
- caiso.com/documents/publicqueuereport.pdf
- interconnection.fyi/project/caiso-2111
- gridstatus.io/interconnection-queue/ix_caiso_37c7f557
Commercial operation date: Only the LBNL snapshot gives a COD (proposed 2032-04-28). The search results contain no developer or news signal for the Los Angeles County 405 MW Fleetwood battery project. The 2 MW Riverside 'Fleetwood Dr.' project is a different, unrelated project.
Developer: LBNL developer field is null and no search result names a developer or parent for CAISO-2111. The aggregator pages (interconnection.fyi, gridstatus) only repeat queue data in their snippets.
Status: LBNL lists the project as active and the CAISO public queue report shows FLEETWOOD 2111 as ACTIVE in C14. No contradicting evidence was found.
About
Generated Apr 10, 2026 · Predates Oct 24, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
The FLEETWOOD project is a proposed 405.51 MW battery storage project located in Los Angeles County, California. Interconnecting to Southern California Edison (SCE), the project is in the California Independent System Operator (CAISO) queue as entry CAISO-2111, with a queue entry date of April 15, 2021. The proposed commercial operation date is April 28, 2032. The project's interconnection status is currently in the System Impact Study phase.
The FLEETWOOD project has been the subject of recent news coverage.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- CAISO queue source as of: Oct 24, 2026.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
CA
County
Los Angeles
Grid Region
CAISO (California)
Market
ISO/RTO Member
Developer
—
Utility
SCE
Entity
CAISO
Service Type
NRIS
Point of Interconnection
Litehipe Substation 230 kV
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- CAISO
- Trading Hub
- TH_SP15_GEN-APND
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Battery storage queue pipeline
Summary analysis with parallel narrative sections and visualizations.
Battery Storage queue pipeline overview
Summary analysis with parallel narrative sections and visualizations.
FLEETWOOD queue pipeline — 1 projects by technology and status
Data-driven briefing on FLEETWOOD — fleet, generation, financial, and news signals.
FLEETWOOD
Data-driven briefing on FLEETWOOD — fleet, generation, financial, and news signals.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.