WESTON STORAGE
213.596 MW storage in San Bernardino, CA · In queue since April 2021 · Proposed COD March 2031
213.596 MW
Capacity
1
Components
Battery
5y 7m
In Queue
System Impact Study
IA Phase
COD target: 2031
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
9y 11m
Study Phase
C14
Interconnection request submitted to ISO/RTO
Active sheet; C14
CAISO uses cluster studies where projects are batched annually and studied together.
Typical: 36–48 months (IR to IA)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2031-03-26
Cross-source intelligence
Experimental assessment saved at the research date. Predates the Oct 24, 2026 queue source. See the queue record for reported project facts.
Research sources and reasoning (3 recorded sources)
low confidence at research time
- cleanview.co/power-projects/planned/battery-storage-projects/california/2101_storage/weston-storage
- renewablesinfo.org/project/caiso-2101-weston-storage
- caiso.com/documents/publicqueuereport.xlsx
Commercial operation date: Only LBNL queue data provides a COD target of 2031-03-26. No news articles, press releases, or developer announcements found for this specific project to validate or update this date.
Developer: LBNL snapshot lists developer as null. Search results returned no project-specific news, press releases, or corporate announcements identifying the developer or project sponsor.
Status: LBNL reports 'active' status in System Impact Study phase. No contradictory information or project updates found in search results.
About
Generated Apr 10, 2026 · Predates Oct 24, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
The proposed WESTON STORAGE project is a 213.6 MW battery storage development in San Bernardino County, California. Interconnection is requested through Southern California Edison (SCE) in the CAISO queue, identified as CAISO-2101. The project entered the queue on April 15, 2021, and has a proposed commercial operation date of March 26, 2031. Its interconnection status is currently in the System Impact Study phase.
The WESTON STORAGE project has been the subject of recent news coverage, with eight articles categorized as industry news and deal announcements.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- CAISO queue source as of: Oct 24, 2026.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
CA
County
San Bernardino
Grid Region
CAISO (California)
Market
ISO/RTO Member
Developer
—
Utility
SCE
Entity
CAISO
Service Type
NRIS
Point of Interconnection
Kramer Substation 230 kV
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- CAISO
- Trading Hub
- TH_SP15_GEN-APND
- Hub Confidence
- MEDIUM
- Nearest Node (Estimated)
- KRAMER_1_N001
- POI Substation
- Kramer Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Last updated 2026-04-09
View all articlesForward forecasts, scenario decomposition, and risk-decision tooling for this queue project.