MINERAL KING SOLAR
429.511 MW hybrid in Tulare, CA · In queue since April 2021 · Proposed COD September 2029
429.511 MW
Capacity
2
Components
Solar + Battery
5y 7m
In Queue
System Impact Study
IA Phase
COD target: 2029
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
8y 5m
Study Phase
C14
Interconnection request submitted to ISO/RTO
Active sheet; C14
CAISO uses cluster studies where projects are batched annually and studied together.
Typical: 36–48 months (IR to IA)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2029-09-26
Cross-source intelligence
Experimental assessment saved at the research date. See the queue record for reported project facts.
Research sources and reasoning (3 recorded sources)
low confidence at research time
- interconnection.fyi/project/caiso-2081
- caiso.com/documents/publicqueuereport.pdf
- interconnection.fyi/projects/market/CAISO
Commercial operation date: Only the LBNL/CAISO queue date (2029-09-26) exists; the interconnection.fyi page repeats the same proposed completion date as a queue mirror, not as an independent developer-backed signal. No news or press release gives a different target.
Developer: LBNL developer field is null and no search result names a developer, parent, or operating company for Mineral King Solar.
Status: LBNL status is active and the CAISO public queue report and queue aggregators list the project as ACTIVE. No evidence of withdrawal or construction.
About
Generated Apr 10, 2026 · Predates Oct 24, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
The proposed MINERAL KING SOLAR project is a 429.51 MW hybrid solar and battery energy storage system located in Tulare County, California. The project, which consists of 215.41 MW of solar generation and 214.1 MW of battery storage, is interconnected to Southern California Edison (SCE) via the Rector Substation 220 kV.
The project is listed in the CAISO interconnection queue under queue ID CAISO-2081, with an entry date of April 15, 2021. Its proposed commercial operation date is September 26, 2029. The project's interconnection status is currently in the System Impact Study phase.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- CAISO queue source as of: Oct 24, 2026.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
CA
County
Tulare
Grid Region
CAISO (California)
Market
ISO/RTO Member
Developer
—
Utility
SCE
Entity
CAISO
Service Type
NRIS
Point of Interconnection
Rector Substation 220 kV
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- CAISO
- Trading Hub
- TH_ZP26_GEN-APND
- Hub Confidence
- MEDIUM
- Nearest Node (Estimated)
- RECTOR_6_N009
- POI Substation
- Rector Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Solar queue pipeline by status
Data tables and metrics from the InfraSure database.
AEP Jacksonville Solar Project
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
can you provide me with the capacity factor for allrenewable facilities in 2024
Data tables and metrics from the InfraSure database.
Top 10 solar states
Data tables and metrics from the InfraSure database.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.