DRIFTER ENERGY STORAGE (CAISO-2066) — Project Summary

Queue ID
CAISO-2066
Capacity
504.8 MW
Technology
Battery
Status
active
Location
Ventura, CA
Region
CAISO
Developer
—
IA Status
IA Executed

DRIFTER ENERGY STORAGE

CAISO-2066BetaActiveBatteryCAISOLBNL + Live

504.8 MW storage in Ventura, CA · In queue since April 2021 · Proposed COD March 2033

BA: CISOISO/RTO: CAISONERC: WECCRC: RCW

504.8 MW

Capacity

1

Components

Battery

5y 7m

In Queue

IA Executed

IA Phase

Signed Jul 2025

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Queue → IA

4y 3m

IA → COD

7y 8m

Total Duration

4y 3m

Study Phase

C14

Construction75%
Queue EntryApr 15, 2021

Interconnection request submitted to ISO/RTO

Cluster Study (Phase I/II)

CAISO uses cluster studies where projects are batched annually and studied together.

Typical: 36–48 months (IR to IA)

Interconnection AgreementJul 30, 2025

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Active sheet; IA Executed; C14

Project under construction

Typical: 6–18 months

Commercial Operation

Proposed COD: 2033-03-26

News-reported activity
as of 5y 5m ago

From dated articles. These observations may describe earlier stages or other project phases; see the queue record above for reported filing status.

Project statusOperationalVentura County Star · 2021-06-30

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Mar 26, 2033
From queue filing
Developer in saved assessment
—
Status at research time
Active
Active in the CAISO queue with an interconnection agreement executed 2025-07-30. There is no public evidence of permitting, financing or construction, and the proposed COD is 2033.
Financing
Not recorded
Research sources and reasoning (2 recorded sources)

low confidence at research time

  1. interconnection.fyi/project/caiso-2066
  2. interxdata.com/projects/drifter-energy-storage-caiso-public-queue-2066/

Commercial operation date: The only COD signal is the LBNL/CAISO proposed completion date of March 26, 2033. Aggregator pages (interconnection.fyi, Cleanview) repeat that date and are not independent. No developer press release or news article gives a different target.

Developer: The LBNL developer field is null. The news-extracted 'Prologis' comes from a Moorpark city-council article on indoor battery bans, and nothing in it names Drifter or CAISO-2066. The Saticoy/Oxnard 2021 article describes a different, already-operating facility. The Moorpark Substation POI is only circumstantial, so I did not attribute a developer.

Status: LBNL shows status active and IA Executed, and the aggregator pages agree it is active. No source indicates withdrawal, suspension or construction. The news-extracted 'operational' status belongs to an unrelated 2021 Oxnard article.

Project lifecycle
as of 2025-07-26
OperationalNoMoorpark Acorn · 2025-07-26
TechnologyBatteryMoorpark Acorn · 2025-07-26
DeveloperPrologisMoorpark Acorn · 2025-07-26
Permit decisionDeniedMoorpark Acorn · 2025-07-26

About

Saved background

Generated Apr 10, 2026 · Predates Oct 24, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The DRIFTER ENERGY STORAGE project is a proposed 504.8 MW battery storage project located in Ventura County, California. The project is interconnected to the CAISO grid via the Moorpark Substation at 230 kV and is in the CAISO interconnection queue as entry CAISO-2066, with a queue entry date of April 15, 2021. The proposed commercial operation date is March 26, 2033, and the project's interconnection status is currently in the System Impact Study phase.

The DRIFTER ENERGY STORAGE project is proposed by an unknown developer and connects to Southern California Edison (SCE). The project has been the subject of recent news coverage, with four articles categorized as industry, regulatory, and grid-related.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • CAISO queue source as of: Oct 24, 2026.
Development Risk

Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Financing close probability
EPC + tax-equity counterparty
Project Details

State

CA

County

Ventura

Grid Region

CAISO (California)

Market

ISO/RTO Member

Developer

—

Utility

SCE

Entity

CAISO

Service Type

NRIS

Point of Interconnection

Moorpark Substation 230 kV

Data Source

LBNL + Live

ApplicantPrologisMoorpark Acorn · 2025-07-26
AgencyMoorpark City CouncilMoorpark Acorn · 2025-07-26
RulingOrderMoorpark Acorn · 2025-07-26
Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
First-year output estimate
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year revenue projection
First-year DSCR
Financing close risk
Market Context
Approximate
ISO / RTO
CAISO
Trading Hub
TH_SP15_GEN-APND
Hub Confidence
MEDIUM
Nearest Node (Estimated)
MOORPARK_6_N005
POI Substation
Moorpark Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

Insights & Articles (2)Beta

Last updated 2026-04-09

View all articles
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.