SANDRIFT STORAGE 2 (CAISO-2041) — Project Summary

Queue ID
CAISO-2041
Capacity
254.77 MW
Technology
Battery
Status
active
Location
Riverside, CA
Region
CAISO
Developer
—
IA Status
IA Executed

SANDRIFT STORAGE 2

CAISO-2041BetaActiveBatteryCAISOLBNL + Live

254.77 MW storage in Riverside, CA · In queue since April 2021 · Proposed COD March 2031

BA: CISOISO/RTO: CAISONERC: WECCRC: RCW

254.77 MW

Capacity

1

Components

Battery

5y 7m

In Queue

IA Executed

IA Phase

Signed Sep 2025

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Queue → IA

4y 5m

IA → COD

5y 6m

Total Duration

4y 5m

Study Phase

C14

Construction75%
Queue EntryApr 15, 2021

Interconnection request submitted to ISO/RTO

Cluster Study (Phase I/II)

CAISO uses cluster studies where projects are batched annually and studied together.

Typical: 36–48 months (IR to IA)

Interconnection AgreementSep 26, 2025

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Active sheet; IA Executed; C14

Project under construction

Typical: 6–18 months

Commercial Operation

Proposed COD: 2031-03-01

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 24, 2026 queue source. See the queue record for reported project facts.

Research COD
Mar 1, 2031
From queue filing
Developer in saved assessment
—
Status at research time
Active
Active — IA executed September 2025, no construction or financing announcements found
Financing
Not recorded

Milestones in this assessment

IA executedSep 26, 2025Latest in this assessment

Interconnection Agreement executed with CAISO

caiso.com
Research sources and reasoning (2 recorded sources)

low confidence at research time

  1. caiso.com/documents/publicqueuereport.xlsx
  2. cleanview.co/power-projects/planned/battery-storage-projects/california/2041_storage/sandrift-storage-2

Commercial operation date: LBNL queue shows proposed COD of March 2031. No independent news sources or press releases found to validate or contradict this date; all search results merely echo the CAISO queue data.

Developer: LBNL snapshot lists developer as null. No press releases, corporate announcements, or news coverage found identifying the project sponsor or operating company.

Status: LBNL shows 'active' status with IA executed on 2025-09-26. No subsequent news coverage indicates any change in status or progress toward construction.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 24, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

SANDRIFT STORAGE 2 is a proposed battery storage project located in Riverside County, California, with a total capacity of 254.77 MW. The project is in the California Independent System Operator (CAISO) interconnection queue as entry CAISO-2041, with a queue entry date of April 15, 2021. The proposed commercial operation date is March 1, 2031. The project's interconnection status is currently in the System Impact Study phase. Southern California Edison (SCE) is the utility.

The development project consists entirely of battery storage. It has appeared in recent news coverage related to development.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • CAISO queue source as of: Oct 24, 2026.
Development Risk

Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Financing close probability
EPC + tax-equity counterparty
Project Details

State

CA

County

Riverside

Grid Region

CAISO (California)

Market

ISO/RTO Member

Developer

—

Utility

SCE

Entity

CAISO

Service Type

NRIS

Point of Interconnection

Red Bluff Substation 230 kV

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
First-year output estimate
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year revenue projection
First-year DSCR
Financing close risk
Market Context
Approximate
ISO / RTO
CAISO
Trading Hub
TH_SP15_GEN-APND
Hub Confidence
MEDIUM
Nearest Node (Estimated)
OBERON_7_N122
POI Substation
Red Bluff Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.