REDONDA (CAISO-2036) — Project Summary

Queue ID
CAISO-2036
Capacity
541.735 MW
Technology
Solar+Battery
Status
active
Location
Riverside, CA
Region
CAISO
Developer
—
IA Status
IA Executed

REDONDA

CAISO-2036BetaActiveSolarBatteryCAISOLBNL + Live

541.735 MW hybrid in Riverside, CA · In queue since April 2021 · Proposed COD January 2031

BA: CISOISO/RTO: CAISONERC: WECCRC: RCW

541.735 MW

Capacity

2

Components

Solar + Battery

5y 7m

In Queue

IA Executed

IA Phase

Signed Jul 2025

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Queue → IA

4y 3m

IA → COD

5y 6m

Total Duration

4y 3m

Study Phase

C14

Construction75%
Queue EntryApr 15, 2021

Interconnection request submitted to ISO/RTO

Cluster Study (Phase I/II)

CAISO uses cluster studies where projects are batched annually and studied together.

Typical: 36–48 months (IR to IA)

Interconnection AgreementJul 29, 2025

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Active sheet; IA Executed; C14

Project under construction

Typical: 18–30 months

Commercial Operation

Proposed COD: 2031-01-01

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Jan 1, 2031
From queue filing
Developer in saved assessment
Clearway Energy Group
Filed as Redonda PV LLC
Status at research time
IA Executed
Active in the CAISO queue with an LGIA executed (LBNL IA date 2025-07-29). BLM issued the final EA, FONSI and Decision Record around June 2026, so the project is pre-construction. Public documents describe about 200 MW solar plus up to 250 MW BESS, versus 541.7 MW in LBNL, so the project may have been resized or the figures may differ.
Financing
Not recorded

Milestones in this assessment

IA executedJul 29, 2025

LGIA for Redonda PV LLC. The CAISO list confirms the agreement and the date comes from the LBNL snapshot.

caiso.com
Permit approvedJun 2, 2026Latest in this assessment

BLM posted the final Environmental Assessment, FONSI and Decision Record for the Redonda solar project.

eplanning.blm.gov
Research sources and reasoning (6 recorded sources)

medium confidence at research time

  1. eplanning.blm.gov/eplanning-ui/project/2038650/510
  2. renewablesnow.com/news/scoping-launched-on-200-mw-california-solar-plan-by-clearway-unit-1276722/
  3. energystorageconsultants.com/newsletter/Fractal-Energy-Storage-News-Jun-2025.pdf
  4. caiso.com/documents/list-of-large-generator-interconnection-agreements-and-small-generator-interconnection-agreements.pdf
  5. ceqanet.lci.ca.gov/2025110279
  6. caiso.com/documents/publicqueuereport.pdf

Commercial operation date: No search result gives a developer COD target. The only date is the LBNL/CAISO proposed COD of 2031-01-01, which fits a project that received its BLM decision in mid-2026 and has an executed IA.

Developer: The LBNL developer field is blank. The CAISO LGIA list names Redonda PV LLC as the interconnection party, and a June 2025 storage M&A newsletter describes Redonda PV LLC as a wholly owned indirect subsidiary of Clearway. Renewables Now also headlines the project as a 'Clearway unit' plan.

Status: LBNL shows an active queue entry with IA Executed. The CAISO LGIA list includes Redonda PV LLC, and the BLM NEPA decision documents are posted. No source shows withdrawal or construction start.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 24, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The REDONDA project is a proposed 541.74 MW hybrid solar and battery energy storage project located in Riverside County, California. The project consists of 273.02 MW of solar generation and 268.71 MW of battery storage. It is interconnected to Southern California Edison (SCE) and is in the California Independent System Operator (CAISO) interconnection queue as entry CAISO-2036, with a queue entry date of April 15, 2021. The proposed commercial operation date is January 1, 2031, and the project's interconnection status is currently in the System Impact Study phase.

The proposed project's point of interconnection (POI) is the Red Bluff Substation 220 kV. The REDONDA project has been mentioned in recent news coverage related to the energy industry.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • CAISO queue source as of: Oct 24, 2026.
Development Risk

Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Financing close probability
EPC + tax-equity counterparty
Project Details

State

CA

County

Riverside

Grid Region

CAISO (California)

Market

ISO/RTO Member

Developer

—

Utility

SCE

Entity

CAISO

Service Type

NRIS

Point of Interconnection

Red Bluff Substation 220 kV

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Technology
Solar273.021 MW · 50%
Battery268.714 MW · 50%
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
First-year output estimate
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year revenue projection
First-year DSCR
Financing close risk
Market Context
Approximate
ISO / RTO
CAISO
Trading Hub
TH_SP15_GEN-APND
Hub Confidence
MEDIUM
Nearest Node (Estimated)
OBERON_7_N122
POI Substation
Red Bluff Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.