ARTEMIS (CAISO-1980) — Project Summary

Queue ID
CAISO-1980
Capacity
824.672 MW
Technology
Solar+Battery
Status
active
Location
Kern, CA
Region
CAISO
Developer
—
IA Status
System Impact Study

ARTEMIS

CAISO-1980BetaActiveSolarBatteryCAISOLBNL + Live

824.672 MW hybrid in Kern, CA · In queue since April 2021 · Proposed COD October 2029

BA: CISOISO/RTO: CAISONERC: WECCRC: RCW

824.672 MW

Capacity

2

Components

Solar + Battery

5y 7m

In Queue

System Impact Study

IA Phase

COD target: 2029

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

8y 6m

Study Phase

C14

Impact Study25%
Queue EntryApr 15, 2021

Interconnection request submitted to ISO/RTO

Cluster Study (Phase I/II)Current

Active sheet; C14

CAISO uses cluster studies where projects are batched annually and studied together.

Typical: 36–48 months (IR to IA)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2029-10-18

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Oct 18, 2029
From queue filing
Developer in saved assessment
—
Status at research time
Active
Active in the CAISO queue at the System Impact Study stage with no IA date. No public news of construction, permitting or offtake was found.
Financing
Not recorded
Research sources and reasoning (1 recorded sources)

low confidence at research time

  1. cleanview.co/power-projects/planned/solar-farms/california/1980_photovoltaic/artemis

Commercial operation date: Only LBNL gives a proposed COD of 2029-10-18. The Cleanview listing (expected online October 2029) is consistent with it but looks derived from the same queue data, so it is not an independent confirmation. All other search results concern NASA's Artemis II mission or an unrelated software company named Artemis.

Developer: LBNL lists no developer, and no search result identifies the developer of this Kern County solar+storage project. The Artemis (formerly Monalee) software company is a rooftop solar software firm and is unrelated.

Status: LBNL reports an active status with the System Impact Study as the latest IA stage. No search result contradicts this or shows further progress.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 24, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The ARTEMIS project is a proposed 824.67 MW hybrid solar and battery energy storage project located in Kern County, California. The development project consists of 412.34 MW of solar generation paired with 412.34 MW of battery storage. The project is interconnected to the CAISO grid at the Arco 230 kV point of interconnection.

The ARTEMIS project is listed in the CAISO interconnection queue as entry CAISO-1980, with a queue entry date of April 15, 2021. The proposed commercial operation date is October 18, 2029. The project's interconnection status is currently in the System Impact Study phase. Recent news coverage has discussed the project.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • CAISO queue source as of: Oct 24, 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

CA

County

Kern

Grid Region

CAISO (California)

Market

ISO/RTO Member

Developer

—

Utility

PGAE

Entity

CAISO

Service Type

NRIS

Point of Interconnection

Arco 230 kV

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Technology
Solar412.336 MW · 50%
Battery412.336 MW · 50%
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
CAISO
Trading Hub
TH_SP15_GEN-APND
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.