PLUM (CAISO-1968) — Project Summary

Queue ID
CAISO-1968
Capacity
1560 MW
Technology
Solar+Battery
Status
active
Location
Kings, CA
Region
CAISO
Developer
—
IA Status
System Impact Study

PLUM

CAISO-1968BetaActiveSolarBatteryCAISOLBNL + Live

1,560 MW hybrid in Kings, CA · In queue since April 2021 · Proposed COD March 2031

BA: CISOISO/RTO: CAISONERC: WECCRC: RCW

1,560 MW

Capacity

2

Components

Solar + Battery

5y 7m

In Queue

System Impact Study

IA Phase

COD target: 2031

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

9y 11m

Study Phase

C14

Impact Study25%
Queue EntryApr 15, 2021

Interconnection request submitted to ISO/RTO

Cluster Study (Phase I/II)Current

Active sheet; C14

CAISO uses cluster studies where projects are batched annually and studied together.

Typical: 36–48 months (IR to IA)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2031-03-19

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Mar 19, 2031
From queue filing
Developer in saved assessment
—
Status at research time
Active
Active in the CAISO queue at System Impact Study stage; no IA date and no public sign of permitting, construction or offtake.
Financing
Not recorded
Research sources and reasoning (1 recorded sources)

low confidence at research time

  1. cleanview.co/power-projects/planned/battery-storage-projects/california/1968_storage/plum

Commercial operation date: Only the LBNL filing gives a COD (2031-03-19). The Cleanview listing ('expected to come online in March 2031') matches it but looks derived from the same queue data, so it is not independent confirmation.

Developer: The LBNL developer field is null. The news-extracted 'Orion Renewables' comes from an Energy-Storage.News article about an Entergy Arkansas BESS and has no link to the PLUM project in Kings County, CA, so I treated it as a likely false match. No live search result names a developer for PLUM.

Status: LBNL lists the project as active with a System Impact Study and no IA executed. No search result contradicts or enriches that status.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 24, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The PLUM project is a proposed 1560 MW hybrid solar and battery energy storage development in Kings County, California. The project, located within the CAISO region and interconnected with PG&E, consists of a 1040 MW solar component and a 520 MW battery energy storage system. It is listed in the CAISO interconnection queue as entry CAISO-1968, with a queue entry date of April 15, 2021, and a proposed commercial operation date of March 19, 2031. The project's interconnection status is currently in the System Impact Study phase.

The PLUM project has been the subject of recent news coverage, with two articles focusing on deals and regulatory aspects.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • CAISO queue source as of: Oct 24, 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

CA

County

Kings

Grid Region

CAISO (California)

Market

ISO/RTO Member

Developer

—

Utility

PGAE

Entity

CAISO

Service Type

NRIS

Point of Interconnection

Gates 230 kV

Data Source

LBNL + Live

DeveloperOrion RenewablesEnergy-Storage.News · 2025-09-17
TransactionProject financingEnergy-Storage.News · 2025-09-17
OfftakerEntergyEnergy-Storage.News · 2025-09-17
LenderGoogleEnergy-Storage.News · 2025-09-17
Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Technology
Solar1,040 MW · 67%
Battery520 MW · 33%
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
CAISO
Trading Hub
TH_ZP26_GEN-APND
Hub Confidence
MEDIUM
Nearest Node (Estimated)
FIFTHS_7_N003
POI Substation
Gates Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

Insights & Articles (1)Beta

Last updated 2026-03-26

View all articles
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.